Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Adhan Piping Co., Inc. seeks proposals from DBE Firms for the East Hill Road Slope Stabilization project in Preble, NY, covering scopes such as trucking, clearing, aggregate, paving, and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Premium
Access the largest public sector contact database
Close: Dec 31, 2025
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
AvailableThe City of Cumming Department of Utilities seeks a Design-Build Contractor to provide professional design and construction services for emergency slope stabilization at the Sawnee Mountain Tank site, including grading, excavation, erosion and sediment control, retaining wall extension, and vegetation reestablishment. The contractor must provide geotechnical/global stability analysis stamped by a Georgia Licensed Professional Engineer, demonstrate relevant experience (minimum five similar projects in last 10 years), bonding capacity, insurance, and provide a minimum five-year warranty covering design and construction. Proposals will be evaluated on technical approach, experience and qualifications, project understanding and schedule, cost proposal, and references/past performance.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
The City of Cumming Department of Utilities seeks a Design-Build Contractor to provide professional design and construction services for emergency slope stabilization at the Sawnee Mountain Tank site, including grading, excavation, erosion and sediment control, retaining wall extension, and vegetation reestablishment. The contractor must provide geotechnical/global stability analysis stamped by a Georgia Licensed Professional Engineer, demonstrate relevant experience (minimum five similar projects in last 10 years), bonding capacity, insurance, and provide a minimum five-year warranty covering design and construction. Proposals will be evaluated on technical approach, experience and qualifications, project understanding and schedule, cost proposal, and references/past performance.
AvailableReplace three existing sandboxes with Type 227b junction boxes; install 96' of 12" DI pipe; install one new Type 240b catch basin with anchor block and extended sump on the south side of the street end; install 80' of 12" HDPE pipe to the base of the slope, including 20' of existing HDPE pipe to be reused; install 10' dissipation tee and new dissipation pad at the outfall; construct a reinforced soil slope (RSS); asphalt restoration at the street end; jute mat, much, seeding and slope restoration in the unimproved right-of-way; planting and landscape establishment.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Replace three existing sandboxes with Type 227b junction boxes; install 96' of 12" DI pipe; install one new Type 240b catch basin with anchor block and extended sump on the south side of the street end; install 80' of 12" HDPE pipe to the base of the slope, including 20' of existing HDPE pipe to be reused; install 10' dissipation tee and new dissipation pad at the outfall; construct a reinforced soil slope (RSS); asphalt restoration at the street end; jute mat, much, seeding and slope restoration in the unimproved right-of-way; planting and landscape establishment.
AvailableClatsop County Public Works is soliciting bids to stabilize the riverbank, roadway prism, and bridge approach associated with the Stavebolt Bridge on Logan Road. Bids are due December 18, 2025 at 2:00 PM Pacific.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Clatsop County Public Works is soliciting bids to stabilize the riverbank, roadway prism, and bridge approach associated with the Stavebolt Bridge on Logan Road. Bids are due December 18, 2025 at 2:00 PM Pacific.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis