Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of North Palm Beach is soliciting bids for removal and reconstruction of approximately 3,710 linear feet of 8-foot concrete wall (East Alley Wall Replacement). The ITB includes construction plans and a geotechnical report; bids are due December 18, 2025 at 2:00 PM Eastern with a non-mandatory pre-bid meeting on December 2, 2025 at 10:30 AM Eastern.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The Village of North Palm Beach is soliciting bids for removal and reconstruction of approximately 3,710 linear feet of 8-foot concrete wall (East Alley Wall Replacement). The ITB includes construction plans and a geotechnical report; bids are due December 18, 2025 at 2:00 PM Eastern with a non-mandatory pre-bid meeting on December 2, 2025 at 10:30 AM Eastern.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
The Village of North Palm Beach is soliciting bids for removal and reconstruction of approximately 3,710 linear feet of 8-foot concrete wall (East Alley Wall Replacement). The ITB includes construction plans and a geotechnical report; bids are due December 18, 2025 at 2:00 PM Eastern with a non-mandatory pre-bid meeting on December 2, 2025 at 10:30 AM Eastern.
AvailableEast vine street wall replacement.
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
East vine street wall replacement.
AvailableWork includes repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
Posted Date
Dec 6, 2025
Due Date
Jan 13, 2026
Release: Dec 6, 2025
Close: Jan 13, 2026
Work includes repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
AvailableDesign-build services to replace the east curtain wall system and renovate/repurpose the former 6,296 SF math library in Vincent Hall into study, collaboration, TA and graduate student workspace and offices. Scope includes curtain wall replacement (hazardous material abatement, new fireproofing, interior finishes replacement where impacted), interior finishes and furniture, minimal wall reconstruction, ADA upgrades, preparation of furniture bid documents, and full design-through-construction administration. Construction budget: $7,500,000. Substantial completion required by January 29, 2027.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
Design-build services to replace the east curtain wall system and renovate/repurpose the former 6,296 SF math library in Vincent Hall into study, collaboration, TA and graduate student workspace and offices. Scope includes curtain wall replacement (hazardous material abatement, new fireproofing, interior finishes replacement where impacted), interior finishes and furniture, minimal wall reconstruction, ADA upgrades, preparation of furniture bid documents, and full design-through-construction administration. Construction budget: $7,500,000. Substantial completion required by January 29, 2027.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis