Ramsey-Washington Metro Watershed District
Special DistrictMN
Aug 10, 2026
Closes
Aug 31, 2026
Fish Creek Tributary Stream Restoration RFP
The Work includes, but is not limited to, mobilization; providing, maintaining, and removing erosion and sediment controls facilities including, but not limited to, sediment logs, construction exit, rock filter dike, erosion control blanket, straw mulch, and inlet protection; cutting and disposing of herbaceous and woody vegetation; tree removals; salvaging and replacing topsoil; debris excavation and management, soil excavation, embankment, and grading; hauling and disposal of excess excavated soils and debris; installing boulder vanes, riffles, pools; stabilizing banks utilizing vegetated reinforced soil slopes, riprap, and associated plantings; preparing soils for seeding and planting; site restoration with trees, perennial plantings, seed, and straw mulch; three-year vegetation establishment and maintenance; all as provided for in the Bidding Documents.