CityMN
Posted
Sep 17, 2026
Oct 7, 2026
Well 10 New Source Development RFP
Construction, development, and performance testing of the new 18" x 12" gravel packed well to a depth of approx., 30'
Description: E-seal technology: a new paradigm for leaky well remediation - Oil and Gas Recovery (legacy well plugging and abandonment, sustained casing pressure remediation, methane leak compliance) Geothermal Energy (well integrity repair, asset life extension for high-cost geothermal wells) Carbon Capture (caprock and wellbore integrity for long-term CO2 containment) Critical Infrastructure (dams, tunnels, underground vaults, reservoirs) Mining and Subsurface Storage (abandoned mine workings, underground storage caverns, fault zones).
Federal · NM, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Triad National Security (Los Alamos) (Contractor).
Adjacent opportunities open for bidding right now.
CityMN
Posted
Sep 17, 2026
Oct 7, 2026
Construction, development, and performance testing of the new 18" x 12" gravel packed well to a depth of approx., 30'
CountyAL
Posted
Sep 1, 2026
Sep 29, 2026
Jefferson County Commission is soliciting bids for PROPERTY REMEDIATION under BID #58-26. The official listing directs vendors to the invitation-to-bid materials and identifies Charles Lindsey as the contact. The bid was issued on September 1, 2026, is due on September 29, 2026, and is scheduled to open on September 30, 2026.
California Department of General Services
State AgencyCA
Posted
Sep 4, 2026
Sep 22, 2026
1. Review and interpretation of laboratory test results analysis, and recommendation of remediation services 2. Legionella remediation services 3. Professional final report.
Jordan Valley Water Conservancy District
Special DistrictUT
Posted
Sep 9, 2026
Sep 29, 2026
Work shall include but is not limited to the following: removal of the motor and pump, inspection and reconditioning of the motor, well video survey, brushing and bailing of well, furnish and installation of new pumping equipment, well disinfection, testing, restoration of the site and facility to its preconstruction condition, and performing all work.