Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of an existing bridge and the construction of a new 100-foot single span prestressed concrete nu girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of a deficient bridge with a new single-span concrete box beam bridge.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
Replacement of a deficient bridge with a new single-span concrete box beam bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Sacramento solicits bids to construct a new vertical lift bridge over the Sacramento River between Sacramento and West Sacramento, remove obsolete bridges, and perform associated roadway, levee, utility, and trail reconstruction work. The project includes substantial roadway reconfigurations (Bercut Drive, Jibboom Street, Railyards Boulevard, C Street), levee reconstruction to meet design standards, retaining walls, utility relocations, traffic signal and lighting work, and Buy America requirements. The estimated value is approximately $260 million, with a non-mandatory virtual pre-bid meeting and an online Q&A period; responses are due 2026-02-18.
Posted Date
Dec 19, 2025
Due Date
Feb 18, 2026
Release: Dec 19, 2025
Close: Feb 18, 2026
The City of Sacramento solicits bids to construct a new vertical lift bridge over the Sacramento River between Sacramento and West Sacramento, remove obsolete bridges, and perform associated roadway, levee, utility, and trail reconstruction work. The project includes substantial roadway reconfigurations (Bercut Drive, Jibboom Street, Railyards Boulevard, C Street), levee reconstruction to meet design standards, retaining walls, utility relocations, traffic signal and lighting work, and Buy America requirements. The estimated value is approximately $260 million, with a non-mandatory virtual pre-bid meeting and an online Q&A period; responses are due 2026-02-18.
AvailableRelease: Dec 24, 2025
Close: Jan 20, 2026
Bridge replacement.
AvailableProcurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Procurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →