Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Auburn Hills
Construction of approx., 1,985 LF of 14" water main via directional boring and approx., 115 LF of 12" water main via open cut as well as the construction of approx., 1,750 LF of 14" water main via directional boring and approx., 585 LF of 12" water main via open cut.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of LaBelle
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
City of LaBelle
Close: Dec 16, 2025
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
AvailableMarion County
The Project consists approx: 14,000LF 6" diameter water main pipe; 270LF gravel driveway replacement; 320LF crushed stone backfill. see outside link.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
Marion County
Close: Nov 20, 2025
The Project consists approx: 14,000LF 6" diameter water main pipe; 270LF gravel driveway replacement; 320LF crushed stone backfill. see outside link.
Madison County
Madison County, Alabama seeks bids to install approximately 15,000 LF of 6‑inch PVC and 6,000 LF of 6‑inch ductile iron water main along County Lake Road, including appurtenances, service transfers, testing/disinfection, surface restoration, and site rehabilitation. Bids are due December 4, 2025 at 2:00 PM Central.
Posted Date
-
Due Date
Dec 4, 2025
Madison County
Close: Dec 4, 2025
Madison County, Alabama seeks bids to install approximately 15,000 LF of 6‑inch PVC and 6,000 LF of 6‑inch ductile iron water main along County Lake Road, including appurtenances, service transfers, testing/disinfection, surface restoration, and site rehabilitation. Bids are due December 4, 2025 at 2:00 PM Central.
AvailableBaltimore County
Baltimore County Government (MD) issued an IFB to replace a 20-inch water main along Joppa Road between Fairmount Avenue and LaSalle Road, with associated requirements and instructions provided via EMMA and the County’s DPW page. The solicitation was posted November 17, 2025; a pre-bid meeting is scheduled for December 3, 2025, and responses are due January 20, 2026.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Baltimore County
Close: Jan 20, 2026
Baltimore County Government (MD) issued an IFB to replace a 20-inch water main along Joppa Road between Fairmount Avenue and LaSalle Road, with associated requirements and instructions provided via EMMA and the County’s DPW page. The solicitation was posted November 17, 2025; a pre-bid meeting is scheduled for December 3, 2025, and responses are due January 20, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis