Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes two new single-story facilities: a 26,888 SF utility administration building with a glulam structural system, cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems; and a 9,150 SF steel-framed warehouse building with cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems. Bid packaged to prequalify includes epoxy, visual display security, access control and video, audio visual.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes two new single-story facilities: a 26,888 SF utility administration building with a glulam structural system, cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems; and a 9,150 SF steel-framed warehouse building with cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems.
Posted Date
Oct 5, 2025
Due Date
Feb 19, 2026
Release: Oct 5, 2025
Close: Feb 19, 2026
The project includes two new single-story facilities: a 26,888 SF utility administration building with a glulam structural system, cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems; and a 9,150 SF steel-framed warehouse building with cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems.
AvailableBuilding demolition and asbestos & debris removal/two-story residential property.
Posted Date
Dec 24, 2025
Due Date
Jan 27, 2026
Release: Dec 24, 2025
Close: Jan 27, 2026
Building demolition and asbestos & debris removal/two-story residential property.
AvailableWork includes exterior painting maintenance shop single-story building with exposed brick and stucco.
Posted Date
Jan 8, 2026
Due Date
Feb 23, 2026
Release: Jan 8, 2026
Close: Feb 23, 2026
Work includes exterior painting maintenance shop single-story building with exposed brick and stucco.
AvailableRehabilitation and leasing of the Physical Education Building, an 18,750 SF single story structure and the Fine Arts Building/Auditorium, a 24,356 SF two story structure.
Posted Date
Jan 19, 2026
Due Date
Feb 26, 2026
Release: Jan 19, 2026
Close: Feb 26, 2026
Rehabilitation and leasing of the Physical Education Building, an 18,750 SF single story structure and the Fine Arts Building/Auditorium, a 24,356 SF two story structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis