Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes exterior painting maintenance shop single-story building with exposed brick and stucco.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Building will be cleaned prior to stucco repair and painting. Stucco repair must be completed before paint is introduced. All exterior doors and shutters must be painted as well. District office will decide paint colors upon walkthrough with Type of paint recommended during quote to include one coat of exterior commercial grade primer and two coats of exterior commercial grade paint.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
Building will be cleaned prior to stucco repair and painting. Stucco repair must be completed before paint is introduced. All exterior doors and shutters must be painted as well. District office will decide paint colors upon walkthrough with Type of paint recommended during quote to include one coat of exterior commercial grade primer and two coats of exterior commercial grade paint.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes two new single-story facilities: a 26,888 SF utility administration building with a glulam structural system, cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems; and a 9,150 SF steel-framed warehouse building with cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems.
Posted Date
Oct 5, 2025
Due Date
Feb 19, 2026
Release: Oct 5, 2025
Close: Feb 19, 2026
The project includes two new single-story facilities: a 26,888 SF utility administration building with a glulam structural system, cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems; and a 9,150 SF steel-framed warehouse building with cmu exterior walls, face brick, metal wall panels, full fire protection, and complete mep systems.
AvailableProvide exterior repairs and painting building 35 and 39. Contractor must provide all tools, materials, components, labor, and supervision for repair and painting of project 550-26-131 Exterior Repairs and Painting Building 35 and 39.
Posted Date
Jan 8, 2026
Due Date
Feb 25, 2026
Release: Jan 8, 2026
Close: Feb 25, 2026
Provide exterior repairs and painting building 35 and 39. Contractor must provide all tools, materials, components, labor, and supervision for repair and painting of project 550-26-131 Exterior Repairs and Painting Building 35 and 39.
AvailableAddition, exterior renovation and interior renovation of the three-story covenant building and to renovate offices.
Posted Date
Jan 18, 2026
Due Date
Feb 17, 2026
Release: Jan 18, 2026
Close: Feb 17, 2026
Addition, exterior renovation and interior renovation of the three-story covenant building and to renovate offices.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →