SD-465 Dewatering Improvements Project (Request for Qualifications and Proposals)
Perform progressive design-build services for dewatering improvements project.
Description: Work consists of kindergarten expansion and site improvements. Includes removal and replacement of existing site paving, parking lot improvements, along with the construction of a new bus drop-off area to improve traffic flow and student loading and unloading operations. Additional improvements include new asphalt paving, concrete flatwork, fencing and gates, landscaping and irrigation systems, site lighting, electric vehicle (ev) charging stations, and pc-compliant portable ramps to support accessible routes and facility access. The project requires careful coordination of site grading, drainage, pedestrian and vehicular circulation, accessibility requirements, and utility infrastructure to ensure the improvements meet applicable code requirements and district standards. These improvements will include new interior finishes, updated lighting, fire alarm and low-voltage systems, including clocks, speakers, and communications infrastructure, as well as replacement of the existing roofing and HVAC systems to improve building performance, reliability, and the overall learning environment.
SchoolDistrict · CA, US
Adjacent opportunities open for bidding right now.
East Bay Municipal Utility District
Special DistrictCA
Posted
Oct 8, 2026
Dec 18, 2026
Perform progressive design-build services for dewatering improvements project.
CityNJ
Posted
Oct 29, 2026
Dec 1, 2026
Furnish and install electrical services; change current lighting to LED, perform electrical repairs; and inspect electrical components for the purpose of diagnosing and repairing electrical systems in city buildings, facilities, etc. In - addition, the contractor may be required to provide technical knowledge and guidance to solve electrical problems that occur.
CountyMI
Posted
Sep 11, 2026
Nov 13, 2026
The Village of Kingsley Downtown Development Authority invites qualifications and proposals for the acquisition and redevelopment of real property as a mixed-use development in downtown Village of Kingsley, Michigan.
California Department of Water Resources
State AgencyCA
Posted
Aug 27, 2026
Dec 4, 2026
DESIGN-BUILD: Potential water sources (1) existing agricultural drains, (2) groundwater wells, (3) the existing Species Conservation Habitat (SCH) Project, (4) the West Interception Ditch - to maximize the acreages of the following land use objectives (in order of priority).
Decision makers connected to this RFP from Twin Rivers Unified School District.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
395 days before RFP
The CBOC recorded Dry Creek Elementary School hardcourt replacement as in planning.
Hardcourt Replacement 12 Scope of Work: Removal and replacement of hardcourts (playground or asphalt areas) including underground utility infrastructure Total: $17,407,086 School Sites: • Completed: CCAA 7-12 Foothill Ranch MS Madison ES Westside ES • In Progress: Grant HS (Main) • In Planning: Dry Creek ES
Citizens' Bond Oversight Committee Meeting
Agenda packet · Sep 29, 2025
Agenda packet
395 days before RFP
The agenda presentation listed a Dry Creek ES restroom and staff-lounge refresh as in planning.
Restroom & Staff Lounge Refreshes 2727 Scope of Work: Replacement of finishes, fixtures and furniture (as needed) Total: $13,370,513 School Sites: • Completed: • Fairbanks ES • Northwood ES • Rio Linda Prep • Westside ES • In Progress: • Del Paso ES • Grant HS (Main & West) • Hagginwood ES • Oakdale ES • Martin L. King, Jr. Tech • Rio Linda HS • In…
Citizens' Bond Oversight Committee Meeting
Agenda packet · Sep 29, 2025
Budget
128 days before RFP
The adopted budget lists a $3,037,724 Dry Creek ES hardcourt replacement assigned to Measure K and scheduled from Winter 2025 through Winter 2027.
Project Descriptions Estimated Total Cost Fund Start Date End Date Lifespan Pacific HS Flooring 113,756$ FD 14 - Deferred Maintenance Summer 2025 Summer 2026 5 years Pioneer ES Flooring 819,855$ FD 14 - Deferred Maintenance Winter 2025 Fall 2026 5 years Madison ES Dry Rot/Painting 360,000$ FD 14 - Deferred Maintenance Summer 2025 Summer 2026 10 years…
Board meeting
9 days before RFP
The Board adopted Resolution No. 1677 authorizing lease-leaseback delivery and issuance of RFQ-P No. 27-003 for the Dry Creek TK expansion and site-improvements project.
J. CONSENT AGENDA Motion by Michael Baker, seconded by Stacey Bastian. Result: Yes, Yes: 7, No: 0 • Christine Jefferson - Yes • Sascha Vogt - Yes • Michael Baker - Yes • Stacey Bastian - Yes • Basim Elkarra - Yes • Sharon Reichelt - Yes • Emmanuel Amanfor - Yes 2 1. APPROVE October 6, 2026, Regular and Virtual School Board Meeting Minutes 2. APPROVE Routine…
Twin Rivers Unified School District Regular And Virtual School Board Meeting
Board meeting · Oct 20, 2026
RFP published
Proposals due (14 days left)
Twin Rivers Unified School District FY2026-27 Budget
Budget · Jun 23, 2026
Dry Creek ES Hardcourt Replacement 3,037,724$ Measure K (FD 21 RC 9465) Winter 2025 Winter 2027 15 years
Twin Rivers Unified School District FY2026-27 Budget
Budget · Jul 1, 2026
Dry Creek ES Hardcourt Replacement 3,037,724$ Measure K (FD 21 RC 9465) Winter 2025 Winter 2027 15 years Garden Valley ES Hardcourt Replacement 2,307,426$ Measure K (FD 21 RC 9465) Spring 2026 Fall 2026 15 years Kohler ES Hardcourt Replcament 3,009,718$ Measure K (FD 21 RC 9465) Spring 2026 Winter 2026 15 years Northwood ES Hardcourt Replcament 4,730,414$…
Twin Rivers Unified School District FY2026-27 Budget
Budget · Jul 1, 2026