Special DistrictIL
Jul 6, 2026
Closes
Aug 24, 2026
Administration Building: Lab and Office Renovation
Work consists of building renovation.
Description: Work Building 800 Science Lab Renovation .
HigherEducation · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to J. F. Drake State Technical College.
Adjacent opportunities open for bidding right now.
Special DistrictIL
Jul 6, 2026
Closes
Aug 24, 2026
Work consists of building renovation.
Higher EducationAL
Jun 24, 2026
Closes
Sep 3, 2026
Finish upgrades in first floor corridors including new ceilings and lighting. Interior painting in High Bay and Labs. Demolition of existing first floor restrooms and build-out of newly reconfigured restrooms. New access controls on four doors. Removal of three concrete exterior stairs and railings and one new exterior stair, railings, sidewalk and curb ramp. The existing switchgear is to be removed and replaced new. New service entrance rated circuit breakers are to be installed and low voltage distribution equipment is to be located in same location as the existing. New medium voltage transformers to be relocated outside of the building. New medium voltage cabling (from existing switch) and manholes to be installed to accommodate new transformers. Scope also includes associated sitework.
FederalWA
Aug 14, 2026
Closes
Sep 14, 2026
Building 206 Lab Upgrade AND Building 233 Breakroom Renovation.
Rutgers University New Brunswick
Higher EducationNJ
Jul 30, 2026
Closes
Sep 2, 2026
Medical science building (msb) renovation.