Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes channel excavation, grading, embankment, culvert installation, a rock chute, seeding and other miscellaneous items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes approx 46,612 CY of Excavation, 254 CY of Select Backfill; 7 EA of 24" Cast Iron; 87 LF of Culvert- removed; 40 CY of Road surfcae aggregate.
Posted Date
Jan 13, 2026
Due Date
Feb 5, 2026
Release: Jan 13, 2026
Close: Feb 5, 2026
The project includes approx 46,612 CY of Excavation, 254 CY of Select Backfill; 7 EA of 24" Cast Iron; 87 LF of Culvert- removed; 40 CY of Road surfcae aggregate.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 48,069 CY of excavation-channel; 556 LF of CSP - 24"; 428 LF of CSP - 108"; 692 LF of culvert - remove (all types and sizes); 1,530 SY of geotextile fabric - RR; 1,075 CY of select backfill.
Posted Date
Jan 13, 2026
Due Date
Feb 5, 2026
Release: Jan 13, 2026
Close: Feb 5, 2026
Work includes approx. 48,069 CY of excavation-channel; 556 LF of CSP - 24"; 428 LF of CSP - 108"; 692 LF of culvert - remove (all types and sizes); 1,530 SY of geotextile fabric - RR; 1,075 CY of select backfill.
AvailableThe RFP is for the 2026 Street Improvement Project, encompassing full depth removal and replacement, milling and overlay of various streets, with optional bid alternates for trail resurfacing, hydrant relocation, and undersealing.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
The RFP is for the 2026 Street Improvement Project, encompassing full depth removal and replacement, milling and overlay of various streets, with optional bid alternates for trail resurfacing, hydrant relocation, and undersealing.
AvailableThe selected firms shall provide engineering design services to prepare schematic design and bid documents (plans, specifications, and engineer’s estimate - PS&E) for public works bidding for the required storm drain rehabilitation/improvement project.
Posted Date
Jan 6, 2026
Due Date
Mar 16, 2026
Release: Jan 6, 2026
Close: Mar 16, 2026
The selected firms shall provide engineering design services to prepare schematic design and bid documents (plans, specifications, and engineer’s estimate - PS&E) for public works bidding for the required storm drain rehabilitation/improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →