Alexander Drive Reconstruction
Curb removal, excavation of pavement and earth, installation of permanent erosion control measures, installation of curb, replacement of pavement, and placement of PCCP drive.
Description: Work includes 2,938 SY remove bituminous pavement; 135 LF remove curb; 2,938 SY fine grading; 150 ton 22a aggregate base; 3 EA regrade structure; 330 ton bit leveling course, mdot 4eml; 190 SY remove bituminous pavement; 190 SY fine grading. See outside link.
City · MI, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CountyIN
Posted
Sep 11, 2026
Sep 29, 2026
Curb removal, excavation of pavement and earth, installation of permanent erosion control measures, installation of curb, replacement of pavement, and placement of PCCP drive.
CityWI
Posted
Sep 10, 2026
Sep 24, 2026
Installation of new pump bases, guiderails and piping in existing wet well to remain. Installation of new valve vault and associated valves/piping. Installation of new forcemain to receiving manhole. Temporary pumping during installation.
CityTX
Posted
Aug 26, 2026
Sep 25, 2026
Work includes the complete reconstruction of carlisle drive from lake dallas drive to main street, replacement of the existing sanitary sewer system and associated appurtenances, including a new bore crossing beneath the dart right-of-way, construction of a new storm drainage system removal of existing roadside drainage ditches, replacement of existing railroad crossing header at the dart rail crossing, and all associated work necessary to complete the improvement.
CityOH
Posted
Jun 10, 2026
Oct 2, 2026
Project includes reconstruction of approx. 1,240 feet of drive and installation of storm and sanitary sewers.