Virginia Department of Transportation
State AgencyVA
Posted
-
Oct 28, 2026
A85_2026 Bridge Deck Replacement
Work include 48 LF 15" conc. Pipe; 131 LF 15" storm sewer pipe; 140 CY regular excavation; 276 CY siltation control excavatio; 152 LF saw-cut asphalt concrete 2" depth; 98 LF saw-cut asphalt concrete full depth; 114 LF pipe underdrain 6" const; 734 SY bridge deck grooving const; 734 SY cover depth survey const; 477 LF concrete parapet sscp-1; 417 LF underdrain ud-4 140 LF curb, std. Cg-3; 546 LF guardrail gr-mgs1, 9' post; 705 SY demo. Of pvmt; 108 LF sign post stp-1, 2 3/16", 10 gauge; 243 LF sign post stp-1, 2 1/2", 10 gauge.