Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Domestic hot water system replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Mechanical, electrical and plumbing construction for boiler/thermostat replacement & domestic hot water heaters installation.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Mechanical, electrical and plumbing construction for boiler/thermostat replacement & domestic hot water heaters installation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The configuration requires the boilers to operate year-round. Remove and properly dispose of the existing shell-and-tube water heater. Furnish and install electric water heaters and a holding tank to provide the building with adequate domestic hot water.
Posted Date
Jan 20, 2026
Due Date
Mar 4, 2026
Release: Jan 20, 2026
Close: Mar 4, 2026
The configuration requires the boilers to operate year-round. Remove and properly dispose of the existing shell-and-tube water heater. Furnish and install electric water heaters and a holding tank to provide the building with adequate domestic hot water.
AvailableDetention center two cell renovations and complete domestic water piping replacement. Demolish all existing cold, hot, and hot water return piping, install all new domestic cold, hot, and hot water return piping, replace all existing shut-off valves with new full port bronze ball valves, install new asse 1069 mixing valves for gang showers, replace all existing solenoid valves for cold and hot water supplies to each zone throughout facility.
Posted Date
Jul 22, 2025
Due Date
Feb 5, 2026
Release: Jul 22, 2025
Close: Feb 5, 2026
Detention center two cell renovations and complete domestic water piping replacement. Demolish all existing cold, hot, and hot water return piping, install all new domestic cold, hot, and hot water return piping, replace all existing shut-off valves with new full port bronze ball valves, install new asse 1069 mixing valves for gang showers, replace all existing solenoid valves for cold and hot water supplies to each zone throughout facility.
AvailableWork includes plumbing upgrades to the csms restrooms and custodial closet to correct deficiencies in the domestic hot water system and to address vent piping conditions beneath the women s restroom sink. Work includes re-piping a portion of the domestic hot water system serving the restrooms to increase pipe size and allow hot water piping to properly serve the showers instead of tempered water piping; installing balancing valves on domestic hot water recirculation circuits; adding an expansion tank to reduce piping stress and meet code requirements; replacing the strainer and check valve on the domestic hot water recirculation piping within the custodial closet; replacing shower cartridges/valves to properly regulate shower supply temperature and reduce pressure loss caused by calcium buildup from hard water; etc, see attached file.
Posted Date
Jan 26, 2026
Due Date
Feb 20, 2026
Release: Jan 26, 2026
Close: Feb 20, 2026
Work includes plumbing upgrades to the csms restrooms and custodial closet to correct deficiencies in the domestic hot water system and to address vent piping conditions beneath the women s restroom sink. Work includes re-piping a portion of the domestic hot water system serving the restrooms to increase pipe size and allow hot water piping to properly serve the showers instead of tempered water piping; installing balancing valves on domestic hot water recirculation circuits; adding an expansion tank to reduce piping stress and meet code requirements; replacing the strainer and check valve on the domestic hot water recirculation piping within the custodial closet; replacing shower cartridges/valves to properly regulate shower supply temperature and reduce pressure loss caused by calcium buildup from hard water; etc, see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →