Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dogwood park field and baseball improvement project, a construction project including the excavation of earth, replacement of baseball fields and backstops, soccer fields, irrigation and other related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of remove and replace existing baseball light poles and fixtures.
Posted Date
Jul 10, 2025
Due Date
Feb 25, 2026
Release: Jul 10, 2025
Close: Feb 25, 2026
Work consists of remove and replace existing baseball light poles and fixtures.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes addition of new playground equipment and reconfiguration of an existing play space.
Posted Date
Jan 15, 2026
Due Date
Feb 2, 2026
Release: Jan 15, 2026
Close: Feb 2, 2026
Work includes addition of new playground equipment and reconfiguration of an existing play space.
AvailableWork consists of deer park playground improvement project, include removal of existing playground, excavation, placement of material, loading, hauling and disposal of existing engineered wood fiber, construction of footings, underground drain; installation of new pour in place play surfacing and city supplied play equipment.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
Work consists of deer park playground improvement project, include removal of existing playground, excavation, placement of material, loading, hauling and disposal of existing engineered wood fiber, construction of footings, underground drain; installation of new pour in place play surfacing and city supplied play equipment.
AvailableThis project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →