Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
James Madison University issued RFP# DKM-1246 seeking vendors to provide modular building systems and shipping container solutions including design modifications, transportation, installation, tenant improvements, and related services. The contract performance period begins at award for one year with up to four one-year renewals. Proposals are required to demonstrate appropriate Virginia contractor licensing, bonding capability, and project management staffing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of (3) 24' x 40' modular classroom buildings elementary school.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Construction of (3) 24' x 40' modular classroom buildings elementary school.
AvailableProvide specialized shipping & storage containers. NSN: 8145-01-535-5579. Part Number: 16776-101. Quantity: Estimated 198.
Posted Date
Dec 12, 2025
Due Date
Jan 26, 2026
Release: Dec 12, 2025
Close: Jan 26, 2026
Provide specialized shipping & storage containers. NSN: 8145-01-535-5579. Part Number: 16776-101. Quantity: Estimated 198.
AvailableThe Department of the Army (Army Contracting Command) seeks quotations for six steel storage containers (four 40-foot high-cube and two 20-foot containers) to support 11th Airborne Division G3 Training Support Activity at Joint Base Elmendorf-Richardson, Anchorage, AK. The procurement is a Total Small Business set-aside (NAICS 332311) and will be awarded as a firm-fixed-price agreement, evaluated primarily on price and technical capability. Quotes must be submitted through SAM.gov or emailed to the contracting personnel and are due January 27, 2026 (1200 AKST); delivery is required within 30 days after January 31, 2026 to Range Control-Malemute Location, Building #59004 at JB Elmendorf-Richardson.
Posted Date
Jan 22, 2026
Due Date
Jan 27, 2026
Release: Jan 22, 2026
Close: Jan 27, 2026
The Department of the Army (Army Contracting Command) seeks quotations for six steel storage containers (four 40-foot high-cube and two 20-foot containers) to support 11th Airborne Division G3 Training Support Activity at Joint Base Elmendorf-Richardson, Anchorage, AK. The procurement is a Total Small Business set-aside (NAICS 332311) and will be awarded as a firm-fixed-price agreement, evaluated primarily on price and technical capability. Quotes must be submitted through SAM.gov or emailed to the contracting personnel and are due January 27, 2026 (1200 AKST); delivery is required within 30 days after January 31, 2026 to Range Control-Malemute Location, Building #59004 at JB Elmendorf-Richardson.
Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
Posted Date
Jan 10, 2026
Due Date
Feb 2, 2026
Release: Jan 10, 2026
Close: Feb 2, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.