Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of (3) 24' x 40' modular classroom buildings elementary school.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
Posted Date
Jan 10, 2026
Due Date
Feb 2, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 2, 2026
Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
AvailableScope of work includes the demolition of existing classroom buildings, construction of new modular classroom buildings with associated site work and ADA improvements.
Posted Date
Jan 17, 2026
Due Date
Feb 12, 2026
Release: Jan 17, 2026
Close: Feb 12, 2026
Scope of work includes the demolition of existing classroom buildings, construction of new modular classroom buildings with associated site work and ADA improvements.
AvailableThis RFP is for the demolition of an existing play-box, site preparation for and installation/connection of modular classroom buildings, and construction of a new play-box with resilient surfacing for the Sunnyvale School District.
Posted Date
Jan 21, 2026
Due Date
Feb 9, 2026
Release: Jan 21, 2026
Close: Feb 9, 2026
This RFP is for the demolition of an existing play-box, site preparation for and installation/connection of modular classroom buildings, and construction of a new play-box with resilient surfacing for the Sunnyvale School District.
AvailablePurchase and lease of modular buildings.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Purchase and lease of modular buildings.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →