Abatement and Building Demolition RFP
Work inlcudes regulated-material abatement, selective demolition, and complete building demolition
Description: The Putnam County School District is accepting sealed bids from qualified, licensed, and insured contractors for districtwide building demolition and asbestos abatement at District-owned properties. Work includes utility disconnection, demolition and lawful disposal of debris, backfilling, grading, site stabilization, and required permits and closeout documentation. Projects will be authorized as needed, subject to funding and District approval, and the District does not guarantee a minimum volume of work.
SchoolDistrict · FL, US
Adjacent opportunities open for bidding right now.
CityWI
Posted
Oct 21, 2026
Nov 30, 2026
Work inlcudes regulated-material abatement, selective demolition, and complete building demolition
CityMN
Posted
-
Dec 10, 2026
The Project includes the following Work: • Preconstruction documentation of existing structures. • Demolition of a 2-story masonry building with a complete basement and attached drive-through canopy located at 102 and 104 North Broadway in Crookston, MN. • Site restoration consisting of backfill of the basement excavation and site grading, imported topsoil, grass seeding, asphalt pavement and aggregate base, and concrete sidewalk and aggregate base. • Independent testing agency quality control testing and special inspections. • 3rd party demolition phase vibration monitoring. • Construction phase traffic control on portions of US highway 2. Owner anticipates that the Project’s total bid price will be approximately $960,000.00. The Project must be Substantially complete at a date provided by the contractor in their bid (which shall not be later than May 7, 2027) with Final Completion no later than 21 days after the Contractors Substantial Completion date (which shall not be later than May 28, 2027). For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
CityMN
Posted
Nov 13, 2026
Dec 10, 2026
Demolition of a 2-story masonry building with a complete basement and attached drive-through canopy. Site restoration consisting of backfill of the basement excavation and site grading, imported topsoil, grass seeding, asphalt pavement and aggregate base, and concrete sidewalk and aggregate base.
CityAL
Posted
Nov 18, 2026
Dec 15, 2026
Work include the demolition and removal of three (3) masonry buildings, existing slab, separation and disposal of demolition debris, protection of an existing underground drainage structure, investigative portholes, removal of one (1) failed slab section, installation of a six (6) foot chain link fence and vehicle gate, and related appurtenances.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
587 days before RFP
The School Board approved razing permanent buildings at Melrose Elementary School.
Action: 15. Raze Permanent Buildings - Melrose Elementary School Thomas Bolling, Associate Superintendent, addressed the Board regarding building numbers and answered questions from the Board. Greg Kelley, CRA, also answered questions from the Board. Approve Motion by Holly Pickens, second by Sandra Gilyard. Final Resolution: Motion Passes Aye: David…
School Board Meeting
Board meeting · Apr 15, 2025
Decision makers connected to this RFP from Putnam County School District.
So, we're looking at increase in Mel the number of student stations at Melrose 454 student stations. New square footage will be approximately 35,000 square ft. remodel renovation will be 38,713 and the demolition is right at 70,000 approximately 70,000 square feet. You can see below there some of the remodeling and renovation scope that we were looking at…
Bond Oversight Committee Meeting
Board meeting · Sep 17, 2025
Board meeting
587 days before RFP
The School Board approved razing permanent buildings at Kelley Smith Elementary School.
Buckles, Sandra Gilyard, Holly Pickens, Philip Leary, Linda Wagner Action: 14. Raze Permanent Buildings - Kelley Smith Elementary School Thomas Bolling, Associate Superintendent, addressed the Board regarding building numbers for 3 Kelley Smith and answered questions. Approve Motion by Holly Pickens, second by Sandra Gilyard. Final Resolution: Motion Passes…
School Board Meeting
Board meeting · Apr 15, 2025
We're doing um just so you know the scope of Kelly Smith, we're doing approximately 146,520 ft of new buildings. We've got 14,480 square ft of remodel/rennovation and 88,189 ft of demolition, tearing down the old school there. So drawings, we're currently working on the drawings. Uh October the 6, we're to have 100% construction documents complete and…
Bond Oversight Committee Meeting
Board meeting · Sep 17, 2025
Board meeting
20 days before RFP
The School Board approved raising the permanent buildings of the old Brownie Pierce School.
we will take up item I1, the raise the permanent buildings of the old Brownie Pierce School. >> Mr. Chairman, I'll make a motion that >> [clears throat] >> that we approve the uh the raising of the the old building and uh where I was a an assistant principal for several years. Had a lot of great memories and opportunities between that it was a two campus…
Putnam County School Board School Board Meeting