Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and replace the existing fire alarm system for the entire school. Removal of the existing system includes, but is not limited to, any and all fire alarm system infrastructure, devices, power supplies, control panels, modules and associated system components. Existing system will be replaced with a new addressable fire alarm/voice evacuation system; removing the existing fire alarm system for the school, contractor shall remove any and all associated boxes, conduit pathways, and wiring back to the point of source unless noted otherwise. If infrastructure is recessed in the existing walls and is not being utilized for new devices, conduit systems shall be abandoned in place while the rough-in boxes will be removed and the contractor will be required to cut, patch, paint, and repair walls as required to match existing conditions. If associated infrastructure is exposed on wall and not being utilized for new devices, all will be removed in its entirety
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes replacement of the existing fire suppression and fire alarm systems.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes replacement of the existing fire suppression and fire alarm systems.
AvailableUpgrade of the existing fire alarm system.
Posted Date
Dec 1, 2025
Due Date
Jan 9, 2026
Release: Dec 1, 2025
Close: Jan 9, 2026
Upgrade of the existing fire alarm system.
AvailableFire Alarm System Inspection and Repair.
Posted Date
Aug 26, 2025
Due Date
Jan 8, 2026
Release: Aug 26, 2025
Close: Jan 8, 2026
Fire Alarm System Inspection and Repair.
AvailableWork includes removal and replacement of outdated addressable fire alarm devices installed throughout the facility including parking decks.
Posted Date
Oct 29, 2025
Due Date
Dec 12, 2025
Release: Oct 29, 2025
Close: Dec 12, 2025
Work includes removal and replacement of outdated addressable fire alarm devices installed throughout the facility including parking decks.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis