Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4 EA Diablo circular saw blade: 8 in blade dia., 42 teeth, 0.075 in cut WD, 5/8 in arbor size diablo #: D0842CF no alternates, no exceptions, no excuses.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for quote for an electronic voting system to support up to 600 Town Meeting participants, including provisions for disability access and comprehensive technical support.
Posted Date
Aug 9, 2022
Due Date
Dec 31, 2099
Release: Aug 9, 2022
Close: Dec 31, 2099
Request for quote for an electronic voting system to support up to 600 Town Meeting participants, including provisions for disability access and comprehensive technical support.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
12 Ea bryant 9650ANPB - straight blade plug, 6-50P, 50 A, 250v AC, 2 pole, screw terminals, grounded. 6 Ea Raco 810C - box cover, square box type, 2 gang, galvanized zinc, single receptacle cover type.
Posted Date
Jan 8, 2026
Due Date
Jan 13, 2026
Release: Jan 8, 2026
Close: Jan 13, 2026
12 Ea bryant 9650ANPB - straight blade plug, 6-50P, 50 A, 250v AC, 2 pole, screw terminals, grounded. 6 Ea Raco 810C - box cover, square box type, 2 gang, galvanized zinc, single receptacle cover type.
AvailableThe Kansas Department of Corrections (Larned State Correctional Facility) issued a Request for Quote to construct a 200' x 400' firing range, parking lot and entrance drive at Larned State Correctional Facility. Work includes grading, moving and compacting dirt, installing a 42" x 40' culvert, and providing a one-year warranty; subcontracting is not allowed. Bids are managed through the Kansas Department of Administration, Office of Procurement and Contracts and are due January 28, 2026 (14:00 CST).
Posted Date
Dec 31, 2025
Due Date
Jan 28, 2026
Release: Dec 31, 2025
Close: Jan 28, 2026
The Kansas Department of Corrections (Larned State Correctional Facility) issued a Request for Quote to construct a 200' x 400' firing range, parking lot and entrance drive at Larned State Correctional Facility. Work includes grading, moving and compacting dirt, installing a 42" x 40' culvert, and providing a one-year warranty; subcontracting is not allowed. Bids are managed through the Kansas Department of Administration, Office of Procurement and Contracts and are due January 28, 2026 (14:00 CST).
AvailableRequesting a quote to perform emergency pump station repairs and site improvements - contractor is responsible for temporary bypass of sewage during the rehabilitation of this pump station. Temporary bypass shall be from upstream manhole. To facilitate station bypass, contractor shall install plugs as necessary at the pump station and a temporary tap downstream to provide for continuous flow from upstream systems. Contractor is responsible for providing temporary power to the site and will transfer at the end of the project a complete working pump station with electrical service in place. Contractor shall ensure that proper erosion control measures (such as hay bales and/or silt fences) are used to prevent silt and material from disturbed areas from entering stormwater systems or canal tributaries; etc, see outside link.
Posted Date
Jan 7, 2026
Due Date
Jan 15, 2026
Release: Jan 7, 2026
Close: Jan 15, 2026
Requesting a quote to perform emergency pump station repairs and site improvements - contractor is responsible for temporary bypass of sewage during the rehabilitation of this pump station. Temporary bypass shall be from upstream manhole. To facilitate station bypass, contractor shall install plugs as necessary at the pump station and a temporary tap downstream to provide for continuous flow from upstream systems. Contractor is responsible for providing temporary power to the site and will transfer at the end of the project a complete working pump station with electrical service in place. Contractor shall ensure that proper erosion control measures (such as hay bales and/or silt fences) are used to prevent silt and material from disturbed areas from entering stormwater systems or canal tributaries; etc, see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →