Aug 4, 2026
Closes
Aug 20, 2026
DHS FLETC Glynco - TSA Academy Renovation (Request for Quotations)
Replace 105 wall-mounted package HVAC units (various sizes with coated coils, heat pumps, and heat strips); install 134 ceiling fans and one 12' outdoor canopy fan; replace exterior doors with steel double doors (with view ports) and FLETC OSPR-specified locks; install ADA ramps at four buildings and modify one ramp for improved accessibility; repair soft floor spots in two modular buildings; install ~6,000 SF Of 4" concrete for the bleacher area under the canopy; clean trench drains adjacent to the canopy.