City of Monticello
DESIGN-BUILD - Develop, Design, Construct, and Transfer a Potential WWTP Expansion, As Well As Necessary Upgrades To Its Phase 5 Long Term Control Plan (LTCP).
Anchorage School District
Design-Build Phase III project will replace the steel heat lines with ppl piping. Replace or relocate sprinkler piping as needed, reroute gas piping, remove abandoned electrical conduit or replace conduits as necessary, remediate hazardous materials, mold as necessary, replace fire rated assemblies and utilidor access. The division 22, 23, and 26 specifications are for this current project and are the minimum requirements for the whs utilidor upgrades phase iii project.
City of Nampa
Provide installation of a new rotary press unit in the Sludge Holding Facility at Nampa Wastewater Treatment Plant as specified and shown in drawings. Two conveyors (one horizonal, and one inclined) will be installed to carry the dewatered sludge to the existing transfer conveyors. Transfer conveyors will be extended to receive the sludge from the new rotary press discharge conveyor.
City of Milton
Work includes WWTP expansion.