Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Sudbury seeks a Designer to provide architectural, mechanical, and electrical services to restore the exterior envelope and upgrade the HVAC system of the Historic Hosmer House in Sudbury, Massachusetts. A mandatory site visit is scheduled for December 16, 2025, and the scope includes design and related oversight for the exterior restoration and HVAC enhancements. This is an open procurement (not a grant), published on COMMBUYS with proposals due January 6, 2026 at 12:00 PM Eastern.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Sudbury (MA) is soliciting design services (RFQ) for exterior restoration and HVAC upgrades at the historic Hosmer House, including architectural, mechanical, and electrical renovation plans and construction oversight. A mandatory site visit is scheduled for December 16, 2025 at 10:00 AM and proposals are due January 6, 2026 by 12:00 PM EST; submissions require a hard copy plus an electronic copy (flash drive).
Posted Date
Nov 20, 2025
Due Date
Jan 6, 2026
Release: Nov 20, 2025
Close: Jan 6, 2026
The Town of Sudbury (MA) is soliciting design services (RFQ) for exterior restoration and HVAC upgrades at the historic Hosmer House, including architectural, mechanical, and electrical renovation plans and construction oversight. A mandatory site visit is scheduled for December 16, 2025 at 10:00 AM and proposals are due January 6, 2026 by 12:00 PM EST; submissions require a hard copy plus an electronic copy (flash drive).
AvailableThe Town of Sudbury (MA) is soliciting design services (RFQ) for exterior restoration and HVAC upgrades at the historic Hosmer House, including architectural, mechanical, and electrical renovation plans and construction oversight. A mandatory site visit is scheduled for December 16, 2025 at 10:00 AM and proposals are due January 6, 2026 by 12:00 PM EST; submissions require a hard copy plus an electronic copy (flash drive).
Posted Date
Nov 20, 2025
Due Date
Jan 6, 2026
Release: Nov 20, 2025
Close: Jan 6, 2026
The Town of Sudbury (MA) is soliciting design services (RFQ) for exterior restoration and HVAC upgrades at the historic Hosmer House, including architectural, mechanical, and electrical renovation plans and construction oversight. A mandatory site visit is scheduled for December 16, 2025 at 10:00 AM and proposals are due January 6, 2026 by 12:00 PM EST; submissions require a hard copy plus an electronic copy (flash drive).
Provide general contracting for hvac improvements at the 39-unit eastridge house apartments. The proposed scope of work (sow) involves the removal and replacement (new) of all electric heaters in the corridors, elevator lobbies, community room, laundry rooms, select storage rooms, public men's room and all other locations per the drawings. All new wiring must be concealed behind gypsum wall board (gwb) or in kcha-approved line hide, wire mold, or cover. There may be variations in the layout from the plan depictions, and it is the contractor's responsibility to verify actual conditions. The contractor is to carry a contingency in their bid proposal accounting for variations and will be responsible for all wiring, hvac installation, routing, connections, testing, commissioning, balancing and restoration of the interior and exterior finishes or areas affected by the work. Contractor will not be entering apartments for this project.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
A Heating, Ventilation, and Air Conditioning (HVAC) System Cleaning Contractor to perform comprehensive cleaning and restoration of the HVAC system components. The entire HVAC system must be cleaned, with the following included but not limited to: • Air Handlers: Internal surfaces, coils (evaporator fins), blowers, condensation pans, and drains. • Ductwork: All supply, return, and exhaust air ducts (both flexible and rigid). • Air Distribution Devices: Registers, grilles, and diffusers. • Internal Components: Turning vanes, dampers, heat exchangers, and air plenums.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
A Heating, Ventilation, and Air Conditioning (HVAC) System Cleaning Contractor to perform comprehensive cleaning and restoration of the HVAC system components. The entire HVAC system must be cleaned, with the following included but not limited to: • Air Handlers: Internal surfaces, coils (evaporator fins), blowers, condensation pans, and drains. • Ductwork: All supply, return, and exhaust air ducts (both flexible and rigid). • Air Distribution Devices: Registers, grilles, and diffusers. • Internal Components: Turning vanes, dampers, heat exchangers, and air plenums.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Provide general contracting for hvac improvements at the 39-unit eastridge house apartments. The proposed scope of work (sow) involves the removal and replacement (new) of all electric heaters in the corridors, elevator lobbies, community room, laundry rooms, select storage rooms, public men's room and all other locations per the drawings. All new wiring must be concealed behind gypsum wall board (gwb) or in kcha-approved line hide, wire mold, or cover. There may be variations in the layout from the plan depictions, and it is the contractor's responsibility to verify actual conditions. The contractor is to carry a contingency in their bid proposal accounting for variations and will be responsible for all wiring, hvac installation, routing, connections, testing, commissioning, balancing and restoration of the interior and exterior finishes or areas affected by the work. Contractor will not be entering apartments for this project.
Available