Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pasco County (Board of County Commissioners) issued an RFSQ seeking design and post‑design services for Sunlake Boulevard from Center Village Drive to south of Appenzeller Boulevard, covering surveys, design plans, permitting, and coordination with county stakeholders. The solicitation (Ref. RSQ‑BW‑26‑019) was posted on 2025‑12‑18 and is open with a submission deadline of 2026‑01‑27; questions are due 2026‑01‑09. Supporting solicitation documents are available on the Bonfire portal but require a Bonfire account to download.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 3 CY unclassified excavation; 3 CY trench backfill slurry (class 270-e-500); 2 TN ac pavement; 1 CY PCC pavement; 20 SF pcc walk, 4" thick; 60 LF 3" conduit (sch 80 PVC); 3,730 LF inductive loop detector and leads saw cut; 46 EA 3-12" LED vehicle head (complete); 1 EA relocate sign; 233 LF 12" striping (thermoplastic); 70 LF pcc curb & gutter; 1 EA 4-camera video/radar detection system (complete); 48 EA sign panel (post).
Posted Date
Dec 2, 2025
Due Date
Jan 22, 2026
Release: Dec 2, 2025
Close: Jan 22, 2026
Work includes 3 CY unclassified excavation; 3 CY trench backfill slurry (class 270-e-500); 2 TN ac pavement; 1 CY PCC pavement; 20 SF pcc walk, 4" thick; 60 LF 3" conduit (sch 80 PVC); 3,730 LF inductive loop detector and leads saw cut; 46 EA 3-12" LED vehicle head (complete); 1 EA relocate sign; 233 LF 12" striping (thermoplastic); 70 LF pcc curb & gutter; 1 EA 4-camera video/radar detection system (complete); 48 EA sign panel (post).
AvailableThe City of Los Angeles, Bureau of Engineering, is soliciting pre‑design services for the Los Feliz Boulevard Parkway Improvements and Cycletrack project. The scope focuses on feasibility and concept development, preliminary engineering, coordination with stakeholders, and development of pre‑design deliverables to inform subsequent design and implementation. Proposals are due January 29, 2026.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The City of Los Angeles, Bureau of Engineering, is soliciting pre‑design services for the Los Feliz Boulevard Parkway Improvements and Cycletrack project. The scope focuses on feasibility and concept development, preliminary engineering, coordination with stakeholders, and development of pre‑design deliverables to inform subsequent design and implementation. Proposals are due January 29, 2026.
AvailableWork includes boulevard rehabilitation includes installation of sidewalk, signage, striping, drainage improvements, and other necessary work.
Posted Date
Dec 11, 2025
Due Date
Jan 26, 2026
Release: Dec 11, 2025
Close: Jan 26, 2026
Work includes boulevard rehabilitation includes installation of sidewalk, signage, striping, drainage improvements, and other necessary work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →