Summary
The North Carolina School for the Deaf in Morganton is seeking a Design-Build contractor for a comprehensive campus infrastructure renovation project through a Request for Qualifications (RFQ). The project encompasses multiple critical infrastructure improvements, including demolishing an abandoned water tower, installing new life safety infrastructure for the Main Building Kitchen and Dining Area, implementing a new campus generator to provide emergency power to dormitories and critical facilities, and completing multiple roof replacements based on a December 2022 roofing study. Sealed qualification packages are due by January 22, 2026, at 3:00 PM, and should be submitted to Muter Construction either via UPS/FedEx, in-person delivery, or electronically.