Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build The project work may include but is not limited to construction of an 18,700sf addition to the existing samuel travis building at tracen yorktown. The project consists of one (1) base item and two (2) option items, with the base work involving design and construction of the first floor of the facility, including demolition, hardware installation, and utility provisions optional items include construction of the faculty admin area and the land-based training room and group session space on the second floor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design/build construction for engineering & weapons training (tew) building phase 2.
Posted Date
Nov 7, 2025
Due Date
Dec 30, 2025
Release: Nov 7, 2025
Close: Dec 30, 2025
Design/build construction for engineering & weapons training (tew) building phase 2.
AvailableSan Joaquin County is soliciting qualifications for a progressive design-build contractor to deliver the BE WELL Phase 2 Campus, including multiple residential/treatment buildings, a support building, sitework, parking, landscaping, and amenities. The project is planned in two phases (Preconstruction and Construction), with an estimated construction budget of approximately $60,000,000 and expected completion in 2029. The selected contractor will perform programming, design development, permitting, and construct the project while participating in partnering and milestone reviews.
Posted Date
Nov 26, 2025
Due Date
Feb 13, 2026
Release: Nov 26, 2025
Close: Feb 13, 2026
San Joaquin County is soliciting qualifications for a progressive design-build contractor to deliver the BE WELL Phase 2 Campus, including multiple residential/treatment buildings, a support building, sitework, parking, landscaping, and amenities. The project is planned in two phases (Preconstruction and Construction), with an estimated construction budget of approximately $60,000,000 and expected completion in 2029. The selected contractor will perform programming, design development, permitting, and construct the project while participating in partnering and milestone reviews.
DESIGN-BUILD: Design-Build methodology of design, demolition and construction of Phase 1 and the preliminary infrastructure design and phasing plan.
Posted Date
Dec 15, 2025
Due Date
Feb 6, 2026
Release: Dec 15, 2025
Close: Feb 6, 2026
DESIGN-BUILD: Design-Build methodology of design, demolition and construction of Phase 1 and the preliminary infrastructure design and phasing plan.
AvailableObtain of Design-Build Done Right® or similar training. The contractor shall be responsible for providing all necessary resources to facilitate the training, including: Certified Instructors: Qualified instructors who are certified and authorized to teach the official Design-Build Done Right® curriculum. Proprietary Course Materials: All copyrighted and proprietary training materials, manuals, and resources required for the course. Logistical Support: All travel, equipment, and administrative support necessary to conduct training sessions. Global and Virtual Delivery: The capability to conduct training at various locations worldwide and/or through a virtual training platform. The objective of the training is to ensure that all participants understand the best practices for Design-Build Done Right® project delivery and can effectively apply the principles of the Design-Build Done Right® process to their projects.
Posted Date
Dec 15, 2025
Due Date
Dec 30, 2025
Release: Dec 15, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Obtain of Design-Build Done Right® or similar training. The contractor shall be responsible for providing all necessary resources to facilitate the training, including: Certified Instructors: Qualified instructors who are certified and authorized to teach the official Design-Build Done Right® curriculum. Proprietary Course Materials: All copyrighted and proprietary training materials, manuals, and resources required for the course. Logistical Support: All travel, equipment, and administrative support necessary to conduct training sessions. Global and Virtual Delivery: The capability to conduct training at various locations worldwide and/or through a virtual training platform. The objective of the training is to ensure that all participants understand the best practices for Design-Build Done Right® project delivery and can effectively apply the principles of the Design-Build Done Right® process to their projects.
Available