Posted
-
Nov 20, 2026
Design to build Millenium Beach Park MAIN Pavilion RFP
Design and construction of the Millenium Beach Park MAIN Pavilion, including removal of the existing structure and installation of the new pavilion.
Description: Progressive DESIGN/BUILD services work. Items of work include: Design and construct a new pavilion and Gazebo.
City · OR, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
51 days before RFP
The Parks and Recreation plan proposed repairing the Siletz Bay Park gazebo.
The Parks & Recreation Advisory Committee is honored to have had the opportunity to review and update the Lincoln City Parks & Recreation 2016 System Plan. We offer the revised plan to the City Council and public with great optimism and excitement for the future. Page 42 of 116 Expense Recovery Provided by Recreation Fees: • Fees increased in 2022, 2024 and…
City of Lincoln City Council Regular Meeting
Agenda packet · Aug 24, 2026
Board meeting
16 days before RFP
Lincoln City Council approved an exemption from competitive bidding for the Taft Pavilion and Gazebo replacement project.
>> I will move to approve the exemption the competitive bidding process for the Taft Pavilion and Gazebo replacement project based on the draft finding. >> Second. been moved by councelor Mark, seconded by councelor Barker to approve the exemption to the competitive bidding process for the Taft Pavilion and gazebo replacement project based on the draft…
City Council And Urban Renewal Agency Of Lincoln City Joint Council Meeting
Board meeting · Sep 28, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (22 days left)
Background: The Siletz Bay Gazebo was constructed in 1987, the Taft Pavillion was constructed by the Urban Renewal Agency, closely following the 1999 Taft Community Vision &Redevelopment Plan. Both need to be replaced. A map showing the locations is attached. Financial Impact The project will be funded through Explore Lincoln City Other Construction.…
City of Lincoln City Council Regular Meeting
Agenda packet · Sep 28, 2026
Adjacent opportunities open for bidding right now.
Posted
-
Nov 20, 2026
Design and construction of the Millenium Beach Park MAIN Pavilion, including removal of the existing structure and installation of the new pavilion.
CityKY
Posted
Oct 9, 2026
Nov 9, 2026
The work consists of the design and construction of an open-sided steel-frame market pavilion, approx. 62 by 85 F, at 709–717 Monmouth Street. It includes structural engineering, foundations, steel framing, a standing-seam metal roof, and subgrade fill and grading within the footprint. Restroom and storage buildings, mechanical, electrical and plumbing work, and concrete flatwork are excluded.
CityCT
Posted
Oct 13, 2026
Nov 10, 2026
Work inlcudes demolition of the existing pavilion structure, foundations, asphalt pad, and adjacent sidewalks; construction of a new pre-engineered pavilion structure with reinforced concrete footings, slab, and sidewalks; installation of associated electrical improvements, and restoration of disturbed areas, including loam and seed.
CityFL
Posted
Sep 27, 2026
Nov 3, 2026
DESIGN BUILD: Provide professional design, engineering, permitting, site development, and construction services for a new concrete skate park facility.
Decision makers connected to this RFP from City of Lincoln City.