Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD Services – Youth Soccer Complex.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Riverfest Park Soccer Renovation Design - Build.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Riverfest Park Soccer Renovation Design - Build.
AvailablePremium
Access the largest public sector contact database
Provide design-build services. Design and construct two covered pavilions located on the visitor side of the football field. Each pavilion shall be designed for multipurpose community and spectator use, with durable, low-maintenance materials suitable for outdoor public settings. Include concrete pads, accessible walkways, and appropriate site grading. Provide electrical service, lighting, and conduit for future security cameras if applicable. Design shall comply with the florida building code (fbc), ada standards for accessible design, and all local permitting requirements.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
Provide design-build services. Design and construct two covered pavilions located on the visitor side of the football field. Each pavilion shall be designed for multipurpose community and spectator use, with durable, low-maintenance materials suitable for outdoor public settings. Include concrete pads, accessible walkways, and appropriate site grading. Provide electrical service, lighting, and conduit for future security cameras if applicable. Design shall comply with the florida building code (fbc), ada standards for accessible design, and all local permitting requirements.
AvailableThe City of Margate is soliciting qualifications for design/build services to convert the Margate Sports Complex to artificial turf fields for the Margate Community Redevelopment Agency. A non-mandatory pre-proposal meeting will be held on December 8, 2025, and responses are due by December 17, 2025 at 11:00 AM.
Posted Date
Nov 7, 2025
Due Date
Dec 17, 2025
Release: Nov 7, 2025
Close: Dec 17, 2025
The City of Margate is soliciting qualifications for design/build services to convert the Margate Sports Complex to artificial turf fields for the Margate Community Redevelopment Agency. A non-mandatory pre-proposal meeting will be held on December 8, 2025, and responses are due by December 17, 2025 at 11:00 AM.
AvailableSoliciting proposals for Design Bid Build Professional Design Services for the renovation of the 46,610 sq. ft. County Administration Building.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
Soliciting proposals for Design Bid Build Professional Design Services for the renovation of the 46,610 sq. ft. County Administration Building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis