Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
NYC Transit Bid Desk
Design and construct the new subway tunnel structure with structural tie-ins.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Chickasha
Design/Build construction of pre-engineered metal building parking canopy.
Posted Date
Nov 14, 2025
Due Date
Dec 4, 2025
Release: Nov 14, 2025
City of Chickasha
Close: Dec 4, 2025
Design/Build construction of pre-engineered metal building parking canopy.
AvailableJacksonville Transportation Authority
Provide design-build services for ultimate urban circulator program phase II - skyway conversion and phase III - neighborhood extension project.
Posted Date
Aug 18, 2025
Due Date
Nov 20, 2025
Release: Aug 18, 2025
Jacksonville Transportation Authority
Close: Nov 20, 2025
Provide design-build services for ultimate urban circulator program phase II - skyway conversion and phase III - neighborhood extension project.
AvailableCollin County Mud 1
North Collin County Municipal Utility District No. 1 is soliciting sealed bids for excavation improvements for Songhill Phase 2, including approximately 114,325 cubic yards of cut and fill with erosion control and retaining walls. Bids are due by 1:30β―PM local time on December 10, 2025 at BGE, Inc. in Frisco, Texas; bid documents are available via CivCast.
Posted Date
-
Due Date
Dec 10, 2025
Collin County Mud 1
Close: Dec 10, 2025
North Collin County Municipal Utility District No. 1 is soliciting sealed bids for excavation improvements for Songhill Phase 2, including approximately 114,325 cubic yards of cut and fill with erosion control and retaining walls. Bids are due by 1:30β―PM local time on December 10, 2025 at BGE, Inc. in Frisco, Texas; bid documents are available via CivCast.
AvailableFDCC (00047)
Design/build construction for engineering & weapons training (tew) building phase 2.
Posted Date
Nov 7, 2025
Due Date
Dec 10, 2025
Release: Nov 7, 2025
FDCC (00047)
Close: Dec 10, 2025
Design/build construction for engineering & weapons training (tew) building phase 2.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis