Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD. Services for Replacement of East End Bridges.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design-Build: Provide design build for the boulevard beach approach and restroom replacement.
AvailableTo provide design-build services required for project administration, technology evaluation, design and installation/replacement of the air conditioning system at bjwsa admin building.
Posted Date
Nov 5, 2025
Due Date
Dec 23, 2025
Release: Nov 5, 2025
Close: Dec 23, 2025
To provide design-build services required for project administration, technology evaluation, design and installation/replacement of the air conditioning system at bjwsa admin building.
Design-build: work includes systemwide blind spot cameras and camera lowering device replacement.
Posted Date
Nov 5, 2025
Due Date
Jan 12, 2026
Release: Nov 5, 2025
Close: Jan 12, 2026
Design-build: work includes systemwide blind spot cameras and camera lowering device replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →