Summary
DESIGN-BUILD: Design-Build Maintenance and Repair of the General Stillwell Memorial Army Reserve Center (ARC) Training Building, Bldg. 1520. This project will eliminate identified deficiencies; extend the economic life of the facility by 25 Years. Building components and systems to be repaired include the roofing, heating, ventilation, and air conditioning (HVAC); electrical distribution; water distribution and fire alarm and suppression systems, ceilings, windows and doors, floor coverings, interior reconfiguration and interior and exterior finishes. Architecture: Project includes repair by replacement to existing failed or failing architectural components. Repair all walls, flooring and ceiling finishes. Repair doors, door frames, windows and all hardware. Current building standards and life safety repairs consistent with a major repair project is required. Mechanical: Repair fan coil units, associated dual temperature piping, condensate drain lines, thermostats, and controls. Electrical: Repair electrical panels, circuit breakers, conduit, conductors, receptacles, switches, and lights. Fire Alarm and sprinkler Systems: Repair sprinkler Systems, fire alarm system, Mass Notification Systems (MNS) and public address system. Security: Repair security systems. Plumbing: Repair all plumbing fixtures, sinks, vanities, commodes, urinals, urinal screens, toilet partitions, toilet accessories, and associated sanitary lines, vent lines, water lines and valves. Roofing: Repair failed low pitch roof with a metal roof and gutter systems. Structural: Building structural systems will be evaluated for strength. Implementation of Progressive Collapse in the design was not needed since there is not significant risk in accordance with UFC 4-010-01 - Paragraph 3-7, DoD Minimum. HAZMAT: If any Asbestos-Containing Material (ACM) is found, it will be abated as an integral part of the repair project in accordance with DA Pam 420-11 Para 2-1b. Site Work: Site work, within the 5-foot line, will be regraded to cause water to flow away from building, include storm water management features, repair by replacement sidewalls, fire-fighting apparatus access routing and landscaping. Exterior: Sealing the exterior with repointing and repair stone / concreate to reduce life cycle maintenance costs and meet the requirements of the Installation Design Guide. Demolition: The project will completely gut the existing building Interior. ATFP: Incorporate minimum anti-terrorism force protection (ATFP) measures. Communications: Repair telephone, data and Local Area Network (LAN) systems. This project shall comply with the Americans with Disabilities Act and demolished failing components will be removed and disposed properly.