This project requires design and construction services to repair the failing, two-story, 56,520 SF Armed Forces Reserve Center (AFRC). The project will repair failing facility components, extend the economic life of the facility by 25 years and provide a modern Armed Forces Reserve Center that enables readiness for the assigned Army Reserve units. Project repairs failing electrical, plumbing, heating, ventilation, and air-conditioning (HVAC) systems, and building envelope including the roof. Repair by replacement of exterior and interior lighting fixtures, ceilings, fire protection system, emergency mass notification system to meet building codes, interior/exterior doors and windows, repair and repaint surfaces in the interior/exterior walls, damaged flooring, and install meters. With respect to the Americans with Disabilities Act (ADA), where deficient, the facility will be brought to standard. Project will demolish and abate all failing components and hazardous material. Asbestos, mold, lead-based paint, biohazard or other hazardous materials, if found, will be handled, stored, and disposed of in accordance with current laws and regulations. This project will require swing space during the project execution but is not anticipated to be a direct project cost. There are twelve (12) items of associated work being performed outside the 5' line of the facility; these associated projects are for the construction of the electric transformer and electric lines to the facility, the replacement of the telecommunication lines to the facility, the repair of the domestic waterline, the repair of the sanitary line, the repair of the fire hydrants and fire waterlines, the repair of the failing non-organizational parking lot, the repair of the fence at the Reserve Center, the restoration of the sidewalks around the facility, the repair of the stormwater basins and piping, the construction of a Mobile Kitchen Trailer concrete pad, the construction of a dumpster enclosure and the construction of a new monument sign.
Available