FederalDC
Posted
Oct 30, 2026
Nov 30, 2026
FWS - Pixley NWR Water Recirculation Design-Build
The U.S. Fish and Wildlife Service seeks a design-build contractor to install an approximately 1.2-mile PVC pipeline and pumping system at Pixley National Wildlife Refuge. The system is intended to improve wetland water reuse and reduce groundwater pumping, and the estimated construction magnitude is $700,000–$750,000. The project is a total small-business set-aside, with work to be completed within 120 days after notice to proceed.
