Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD - Soliciting bids from qualified contractors to provide complete design and construction services to provide and install one (1) aluminum bleacher unit on each side of the existing stadium bleachers at Air Academy High School Stadium.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
Posted Date
Dec 30, 2025
Due Date
Feb 25, 2026
Release: Dec 30, 2025
Close: Feb 25, 2026
DESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
AvailableThis RFP is for the design and construction of an outdoor wheelchair-accessible ramp and landing, along with the creation of designated accessible parking, to provide safe and inclusive beach access.
Posted Date
-
Due Date
Feb 5, 2026
Release: -
Close: Feb 5, 2026
This RFP is for the design and construction of an outdoor wheelchair-accessible ramp and landing, along with the creation of designated accessible parking, to provide safe and inclusive beach access.
AvailableDESIGN-BUILD: Work includes progressive design-build civil and tunnel construction.
Posted Date
Dec 19, 2025
Due Date
Jun 4, 2026
Release: Dec 19, 2025
Close: Jun 4, 2026
DESIGN-BUILD: Work includes progressive design-build civil and tunnel construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →