Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design bid-build - mq-25 aircraft laydown facilities. Site preparation includes utility demolition and relocation, excavation cut and fill and grading. The site is an area of manmade land and releases of contaminants to the soil and groundwater as a result of historical airfield and industrial operations. Special foundation features include deep foundation system with piles. Paving and site improvements include storm water management low impact development (LID) facilities and items, security fence relocation and expansion with lockable pedestrian gates, vehicular circulation areas, parking restriping, expanded security fencing, site cleanup and landscaping. Environmental mitigation includes sampling, staging, and offsite disposal of contaminated soil, treatment (including sampling, licensed operator, and treatment system) of contaminated groundwater and runoff during dewatering activities, disposal of groundwater treatment media, and disposal of AFFF concentrate/solution contained within the existing fire protection system of building lp48. Electrical utilities include underground electrical and communications distribution, transformer, exterior lighting, site security electrical and communications infrastructure to new support facilities. Mechanical utilities include sanitary sewer lines with storm drainage systems, natural gas service, potable water supply lines and fire protection systems. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design/bid/build project. This will have federal transit administration oversight.
Posted Date
Dec 21, 2025
Due Date
Feb 13, 2026
Release: Dec 21, 2025
Close: Feb 13, 2026
Design/bid/build project. This will have federal transit administration oversight.
Available"Design-Build" This contract will be used to provide rapid response modernization efforts in support of existing facilities and laboratories to ensure that major systems are kept on-line and functioning.
Posted Date
Jan 27, 2026
Due Date
Feb 11, 2026
Release: Jan 27, 2026
Close: Feb 11, 2026
"Design-Build" This contract will be used to provide rapid response modernization efforts in support of existing facilities and laboratories to ensure that major systems are kept on-line and functioning.
AvailablePrequalification of Design-Build Entities for Design-Build services for Alameda County Probation Department Facilities, Camp Sweeney, Las Vistas, and Juvenile Justice Center as part of Design-Build Package #4.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Release: Jan 15, 2026
Close: Feb 13, 2026
Prequalification of Design-Build Entities for Design-Build services for Alameda County Probation Department Facilities, Camp Sweeney, Las Vistas, and Juvenile Justice Center as part of Design-Build Package #4.
AvailablePlacer County Water Agency (PCWA) is soliciting statements of qualifications and pricing proposals for a Progressive Design-Build project to design and construct improvements to the Foothill Water Treatment Plant and other water treatment facilities. The project will be delivered in multiple phases using a progressive design-build approach and includes preparing preliminary design reports, identifying priority improvements, coordinating plant outages, and delivering an initial subset of work with combined design and construction cost of at least $5 million. Contact information and full solicitation documents are posted on the buyer's official posting on PublicPurchase (link provided), but documents on PublicPurchase require vendor access to download.
Posted Date
Nov 24, 2025
Due Date
Feb 10, 2026
Release: Nov 24, 2025
Close: Feb 10, 2026
Placer County Water Agency (PCWA) is soliciting statements of qualifications and pricing proposals for a Progressive Design-Build project to design and construct improvements to the Foothill Water Treatment Plant and other water treatment facilities. The project will be delivered in multiple phases using a progressive design-build approach and includes preparing preliminary design reports, identifying priority improvements, coordinating plant outages, and delivering an initial subset of work with combined design and construction cost of at least $5 million. Contact information and full solicitation documents are posted on the buyer's official posting on PublicPurchase (link provided), but documents on PublicPurchase require vendor access to download.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis