Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Beloit seeks professional engineering firms for project design/project management and/or construction inspection for full interior and exterior restoration of the Mill Street elevated water storage tank (cleaning, SP-10 interior abrasive blast, SP-3/exterior surface prep or abrasive blast, NSF-approved coating system, step/platform/roof repairs, outflow pipe and splash pad upgrades, telecom equipment coordination, and DNR permitting). Award(s) may be split between design and inspection or combined; design fee requested as Lump Sum and inspection as Time & Expense Not-to-Exceed. Fast-tracked work with a DNR-mandated completion requirement (end of 2026); proposals evaluated primarily on fee (40 pts), team (20), related experience (20), example plan set (10) and schedule (10).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Professional inspection services during the painting of the warren county one-million-gallon elevated water storage tank.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
Professional inspection services during the painting of the warren county one-million-gallon elevated water storage tank.
AvailableRelease: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableWork includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
AvailableConstruction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis