Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Objective of this research is to develop design and analysis requirements for bridge foundation elements and groups. These requirements shall account for redundancy based on a probabilistic consideration of resistance for foundations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide professional services for bridge inspection and structural analysis services to assist dtpw with compliance with federal, state and local requirements, underwater bridge inspections as well as load ratings of all dtpw guideways, emergency and non-emergency structural analysis and design of repairs and retrofits, use of inspection drones and other state-of-the-art equipment and techniques to gather field inspection data.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
Provide professional services for bridge inspection and structural analysis services to assist dtpw with compliance with federal, state and local requirements, underwater bridge inspections as well as load ratings of all dtpw guideways, emergency and non-emergency structural analysis and design of repairs and retrofits, use of inspection drones and other state-of-the-art equipment and techniques to gather field inspection data.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
WVDOH Operations Division is soliciting qualifications to create a pre‑qualified list of consultants for bridge repair design plans and/or in‑service bridge and tunnel inspection services statewide, which may also include load rating analysis. Multiple assignments may begin in 2025 with quick turnaround requirements for repair design deliverables; multiple consultants may be selected.
Posted Date
-
Due Date
Sep 30, 2028
Close: Sep 30, 2028
WVDOH Operations Division is soliciting qualifications to create a pre‑qualified list of consultants for bridge repair design plans and/or in‑service bridge and tunnel inspection services statewide, which may also include load rating analysis. Multiple assignments may begin in 2025 with quick turnaround requirements for repair design deliverables; multiple consultants may be selected.
AvailableBridge design-build project.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Bridge design-build project.
AvailableDes Moines Water Works is soliciting proposals from licensed engineering consulting firms to provide design services for replacement of the existing Bill Riley Trail pedestrian bridge over the Raccoon River in Water Works Park. The scope includes conceptual design evaluation, permitting, full design, and preparation of plans and specifications. The project is estimated in the $500,000–$2,000,000 range (aggregator estimate) and is funded/managed by Des Moines Water Works (with local funding/foundations and potential STBG grant involvement referenced in municipal documents).
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Des Moines Water Works is soliciting proposals from licensed engineering consulting firms to provide design services for replacement of the existing Bill Riley Trail pedestrian bridge over the Raccoon River in Water Works Park. The scope includes conceptual design evaluation, permitting, full design, and preparation of plans and specifications. The project is estimated in the $500,000–$2,000,000 range (aggregator estimate) and is funded/managed by Des Moines Water Works (with local funding/foundations and potential STBG grant involvement referenced in municipal documents).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →