Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Transportation Research Board
Objective of this research is to develop design and analysis requirements for bridge foundation elements and groups. These requirements shall account for redundancy based on a probabilistic consideration of resistance for foundations.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
West Virginia Department of Transportation
WVDOH Operations Division is soliciting qualifications to create a pre‑qualified list of consultants for bridge repair design plans and/or in‑service bridge and tunnel inspection services statewide, which may also include load rating analysis. Multiple assignments may begin in 2025 with quick turnaround requirements for repair design deliverables; multiple consultants may be selected.
Posted Date
-
Due Date
Sep 30, 2028
West Virginia Department of Transportation
Close: Sep 30, 2028
WVDOH Operations Division is soliciting qualifications to create a pre‑qualified list of consultants for bridge repair design plans and/or in‑service bridge and tunnel inspection services statewide, which may also include load rating analysis. Multiple assignments may begin in 2025 with quick turnaround requirements for repair design deliverables; multiple consultants may be selected.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New Hampshire Department of Transportation
The New Hampshire Department of Transportation seeks proposals for four on-call engineering services contracts for bridge design and related consulting services, each valued at $3,000,000 over five years. Services include bridge design, inspection, environmental documentation, hydraulic analysis, geotechnical evaluations, and project management. Professional Engineer and Land Surveyor licensure in New Hampshire is required.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
New Hampshire Department of Transportation
Close: Dec 11, 2025
The New Hampshire Department of Transportation seeks proposals for four on-call engineering services contracts for bridge design and related consulting services, each valued at $3,000,000 over five years. Services include bridge design, inspection, environmental documentation, hydraulic analysis, geotechnical evaluations, and project management. Professional Engineer and Land Surveyor licensure in New Hampshire is required.
AvailableCity of Santa Barbara
Consultants to assist in developing a rent stabilization analysis and program design.
Posted Date
Dec 18, 2025
Due Date
Jan 9, 2026
Release: Dec 18, 2025
City of Santa Barbara
Close: Jan 9, 2026
Consultants to assist in developing a rent stabilization analysis and program design.
AvailableColorado Northwestern Community College
Work includes add redundancy to fiber network and add new uninterrupted power supplies (UPS).
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Colorado Northwestern Community College
Close: Jan 6, 2026
Work includes add redundancy to fiber network and add new uninterrupted power supplies (UPS).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →