Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition To Existing Probate Office.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition and removal of the existing Town Hall.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Demolition and removal of the existing Town Hall.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the interior demolition of the existing, 2-story building. This building has a combined total area of 145,500 SF. The demolition scope of work includes the removal and disposal of interior walls, doors, ceilings, floor finishes, raised floor system, interior furniture and systems furniture, lighting, electrical, plumbing, mechanical, fire protection.
Posted Date
Dec 21, 2025
Due Date
Jan 7, 2026
Release: Dec 21, 2025
Close: Jan 7, 2026
This project includes the interior demolition of the existing, 2-story building. This building has a combined total area of 145,500 SF. The demolition scope of work includes the removal and disposal of interior walls, doors, ceilings, floor finishes, raised floor system, interior furniture and systems furniture, lighting, electrical, plumbing, mechanical, fire protection.
AvailableProject is a 450,000 SF new high school and demolition of the existing high school.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Project is a 450,000 SF new high school and demolition of the existing high school.
AvailableWork includes 1 LS install soil erosion measures; 1 LS removal of asbestos; 1 LS demolition of site; 410 SY dense graded aggregate, 6" thick; 50 ton hma 12.5m64 base course, 2" thick.
Posted Date
Dec 24, 2025
Due Date
Jan 13, 2026
Release: Dec 24, 2025
Close: Jan 13, 2026
Work includes 1 LS install soil erosion measures; 1 LS removal of asbestos; 1 LS demolition of site; 410 SY dense graded aggregate, 6" thick; 50 ton hma 12.5m64 base course, 2" thick.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →