CityME
Posted
Sep 10, 2026
Sep 30, 2026
Partial Demolition of the Existing Structure RFP
Provide partial demolition of the existing structure, replacement of the existing structure or both.
Description: Contract #1: Removal of the existing wooden structure and proper disposal off site of the same. Repairs to the existing stone/concrete foundation. Construction of a new wooden deck over the Chlorination facilities. Proper protection of existing Chlorination equipment and electrical facilities during construction. Coordination with the metal building manufacturer for delivery and placement of the metal building (by others) on the completed deck.
SpecialDistrict · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityME
Posted
Sep 10, 2026
Sep 30, 2026
Provide partial demolition of the existing structure, replacement of the existing structure or both.
Posted
Aug 24, 2026
Sep 17, 2026
Provide demolition of existing building, providing a licensed asbestos worker, asbestos abatement if present, disposal of all debris.
CityIL
Posted
Aug 19, 2026
Sep 30, 2026
Work includes demolition, removal and disposal of debris, removal of foundation materials as required, filling and grading to leave the property level and compliant with Village requirements
Indiana Department of Transportation
State AgencyIN
Posted
-
Oct 7, 2026
Small Structure Replacement.