Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the production of a family-friendly demolition derby event.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Project consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
AvailableDemolition of 2 residential structures.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Demolition of 2 residential structures.
AvailableDemolition of a building.
Posted Date
Dec 13, 2025
Due Date
Feb 6, 2026
Release: Dec 13, 2025
Close: Feb 6, 2026
Demolition of a building.
AvailableDemolition services.
Posted Date
May 9, 2024
Due Date
Apr 17, 2026