CityNJ
Posted
Sep 3, 2026
Sep 24, 2026
Ecological Facility Stormwater Improvements RFP
Work includes excavation and installation of an infiltration basin, regrading an access road and installation of a drainage swale and other items.
Description: Dementia unit improvements - consists of renovations to seven existing cells as well as exterior improvements to the outdoor recreation area for the entire facility and the portion designated to the specific unit. The work includes widening of cells doors, reconfiguring cells to allow for access of hospital beds, installing new accessible combi units, installation of a new accessible shower unit, and creating a laundry room with storage.
StateAgency · CO, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityNJ
Posted
Sep 3, 2026
Sep 24, 2026
Work includes excavation and installation of an infiltration basin, regrading an access road and installation of a drainage swale and other items.
CityNJ
Posted
Sep 3, 2026
Sep 24, 2026
Work includes excavation and installation of an infiltration basin, regrading an access road and installation of a drainage swale and other items.
CountyTN
Posted
Sep 16, 2026
Oct 7, 2026
Proposed work will generally include removal of an existing wall, enlargement of a doorway to accommodate voter equipment, replacement of a water heater, installation of a concrete pad, and construction of an exterior overhang to protect voting equipment during loading and unloading.
Posted
Sep 1, 2026
Oct 6, 2026
Work inlcudes facility improvements.
Decision makers connected to this RFP from Colorado Department of Corrections.