Mississippi Department of Finance and Administration
State AgencyMS
Posted
Oct 1, 2026
Nov 3, 2026
DCF E Bldg. Reno. PH1 RFP
Building Renovation.
Description: This RFP is for the renovation of the E Building at the Department of Corrections.
StateAgency · MS, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Mississippi Department of Finance and Administration
State AgencyMS
Posted
Oct 1, 2026
Nov 3, 2026
Building Renovation.
Massachusetts Department of Conservation and Recreation
State AgencyMA
Posted
Jun 11, 2026
Jun 30, 2030
The Department of Children and Families (DCF) seeks proposals from Bidders qualified to conduct culturally and linguistically competent and impartial parenting capacity evaluations. Approved Bidders will form a pool of provider resources across the Commonwealth available to conduct parenting capacity evaluations in response to referrals submitted by one of DCF 29 Area Offices.
CityMA
Posted
Oct 2, 2026
Oct 22, 2026
The City of Melrose is soliciting bids for lath-and-plaster restoration in the South Parlor and G.A.R. Hall of its Soldiers and Sailors Memorial Building. Work also includes priming and painting the repaired rooms and demolishing and replacing the kitchen’s acoustical ceiling system. Bids are due October 22, 2026, and a pre-bid conference is scheduled for October 7, 2026, at the building.
Posted
Sep 30, 2026
Oct 23, 2026
The contractor shall provide ALL labor, materials, tools, equipment, transportation, and supervision necessary for repair of the damaged and swelling LVT flooring including proper subfloor preparation, moisture-barrier application, all aspects of applying new LVT in the affected areas, and site cleanup. The contractor shall remove damaged LVT floor planks and associated adhesives from the designated areas. This includes transporting and disposing of all waste in compliance with local, state, and federal regulations. The contractor shall inspect the underlying concrete subfloor after removal of the damaged LVT to identify any cracks, uneven surfaces, or damaged substrate conditions requiring patching or remediation. Any and all subfloor preparation necessary to ensure proper adhesion and performance of the moisture barrier and LVT flooring planks shall be completed as part of this effort.
Decision makers connected to this RFP from Mississippi Department of Corrections.