Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation, destruction, and replacement of groundwater monitoring wells. Work includes destroying and replacing well MW-1, and redeveloping wells MW-7.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consists of civil, structural, mechanical, and electrical installations for the equipping of a well as depicted in the Drawings and Specifications. The civil work includes, but is not limited to, site grading, placement of a aggregate base, the installation of a new decorative iron fence, access gates, a new concrete curb and gutter, and removal of existing landscaping. The structural work includes, but is not limited to, a new CMU wall section, pipe supports, a pump foundation pad, equipment pads, and replacement of an existing energy dissipater structure. The mechanical work includes, but is not limited to, the procurement and installation of well discharge and waste pipelines, valves, fittings, a tapping saddle at an existing water main, and appurtenances. The electrical work includes, but is not limited to, the installation of an Owner provided motor control center (MCC), Owner provided transformer, Owner provided control and communications cabinets, procurement and installation of conduit, pull boxes, power cabling, fiber optic cables, electrical termination to new equipment, and electrical terminations at Owner’s existing equipment.
Posted Date
Oct 1, 2025
Due Date
Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Oct 1, 2025
Close: Jan 13, 2026
The work consists of civil, structural, mechanical, and electrical installations for the equipping of a well as depicted in the Drawings and Specifications. The civil work includes, but is not limited to, site grading, placement of a aggregate base, the installation of a new decorative iron fence, access gates, a new concrete curb and gutter, and removal of existing landscaping. The structural work includes, but is not limited to, a new CMU wall section, pipe supports, a pump foundation pad, equipment pads, and replacement of an existing energy dissipater structure. The mechanical work includes, but is not limited to, the procurement and installation of well discharge and waste pipelines, valves, fittings, a tapping saddle at an existing water main, and appurtenances. The electrical work includes, but is not limited to, the installation of an Owner provided motor control center (MCC), Owner provided transformer, Owner provided control and communications cabinets, procurement and installation of conduit, pull boxes, power cabling, fiber optic cables, electrical termination to new equipment, and electrical terminations at Owner’s existing equipment.
AvailableWork includes installation of approx 2,600 LF of 10", 12", and 16" C900 PVC water transmission pipe, work also includes tie-ins to the existing system and two well sites.
Posted Date
Sep 3, 2025
Due Date
Feb 10, 2026
Release: Sep 3, 2025
Close: Feb 10, 2026
Work includes installation of approx 2,600 LF of 10", 12", and 16" C900 PVC water transmission pipe, work also includes tie-ins to the existing system and two well sites.
AvailableThe City of Vancouver, Washington is rebidding an Invitation to Bid to refurbish the City Hall’s ground source heat pump (GSHP) system, including recovery and replacement of three well pumps, realignment of GSHP piping, new penthouse pumps, and updated valving. Contractors must coordinate with City-provided temporary heating and cooling to maintain indoor conditions. The work must be physically complete within 180 working days from Notice to Proceed, with a final physical completion no later than October 31, 2026.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The City of Vancouver, Washington is rebidding an Invitation to Bid to refurbish the City Hall’s ground source heat pump (GSHP) system, including recovery and replacement of three well pumps, realignment of GSHP piping, new penthouse pumps, and updated valving. Contractors must coordinate with City-provided temporary heating and cooling to maintain indoor conditions. The work must be physically complete within 180 working days from Notice to Proceed, with a final physical completion no later than October 31, 2026.
AvailableVan Dyke Public Schools is soliciting bids for an Electrical Rebid (Electrical Work Package #3) for the 2026 Lincoln High School Improvements project. Bid documents are available electronically (Procore) on or about December 18, 2025, and a pre-bid meeting is scheduled for January 8, 2026, at 2:00 PM local time. Bids will be received and publicly opened on January 29, 2026, at 2:00 PM local time; the Owner (Van Dyke Public Schools) reserves the right to accept or reject any or all bids.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Van Dyke Public Schools is soliciting bids for an Electrical Rebid (Electrical Work Package #3) for the 2026 Lincoln High School Improvements project. Bid documents are available electronically (Procore) on or about December 18, 2025, and a pre-bid meeting is scheduled for January 8, 2026, at 2:00 PM local time. Bids will be received and publicly opened on January 29, 2026, at 2:00 PM local time; the Owner (Van Dyke Public Schools) reserves the right to accept or reject any or all bids.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.