Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Hatfield
Mechanical dredge of up to 1886 CY of material from the Day Pond and dewatering this material. The dredge area is approx. .34 acres and the bottom elevation is 110 ft NVD. The contractor will segregate and dispose of up to 3018 tons of dewatered dredged material. The work also includes removing and replacing one 24' culvert at the end of the pond.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hammond
Work includes clearing and grubbing, site grading, the construction of a berm around the pond, installation of a pond liner, install a new well, and install a water control outlet structure with new sewer pipe.
Posted Date
Oct 31, 2025
Due Date
Nov 19, 2025
Release: Oct 31, 2025
City of Hammond
Close: Nov 19, 2025
Work includes clearing and grubbing, site grading, the construction of a berm around the pond, installation of a pond liner, install a new well, and install a water control outlet structure with new sewer pipe.
255-Network Contract Office 15 (36C255)
Provide restoration and stewardship for numerous ponds. See attached file.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
255-Network Contract Office 15 (36C255)
Close: Dec 4, 2025
Provide restoration and stewardship for numerous ponds. See attached file.
AvailableCity of Carnation
Landfill pond maintenance project. Improvements shall include to grading plan, HDPE geomembrane liner, geotextile filter fabrics, gravel backfill for drains, quarry spalls, temporary erosion control, temporary traffic control, hydroseed restoration and other work.
Posted Date
Nov 10, 2025
Due Date
Nov 24, 2025
Release: Nov 10, 2025
City of Carnation
Close: Nov 24, 2025
Landfill pond maintenance project. Improvements shall include to grading plan, HDPE geomembrane liner, geotextile filter fabrics, gravel backfill for drains, quarry spalls, temporary erosion control, temporary traffic control, hydroseed restoration and other work.
AvailableTown of Whitewright
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Posted Date
Sep 20, 2022
Due Date
Oct 11, 2027
Release: Sep 20, 2022
Town of Whitewright
Close: Oct 11, 2027
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis