Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes conducting hazardous material surveys, removing and disposing of asbestos and hazardous materials, managing universal and containerized wastes, and performing structural evaluations and designs by licensed professionals. It also entails installing temporary structural supports, traffic control, demolishing the former boiler room and loading dock, and excavating pcb-impacted soil. Additional activities involve interior demolition, disposing of pcb-affected building materials, scarifying concrete slabs, media blasting of interior surfaces, and removing an underground storage tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The District of Columbia Department of Energy and Environment (DOEE) issued this solicitation to procure remedial action services for the FY26 Anacostia River Sediment Project (ARSP), including environmental consulting, groundwater remediation, and dredging. The solicitation is posted on the DC OCP portal but directs interested vendors to the Ariba website for full solicitation documents and response instructions. The solicitation opened on 2025-10-21 and is scheduled to close on 2026-01-16.
Posted Date
Oct 21, 2025
Due Date
Jan 16, 2026
Release: Oct 21, 2025
Close: Jan 16, 2026
The District of Columbia Department of Energy and Environment (DOEE) issued this solicitation to procure remedial action services for the FY26 Anacostia River Sediment Project (ARSP), including environmental consulting, groundwater remediation, and dredging. The solicitation is posted on the DC OCP portal but directs interested vendors to the Ariba website for full solicitation documents and response instructions. The solicitation opened on 2025-10-21 and is scheduled to close on 2026-01-16.
AvailableSeeking a remediation contractor who shall be required to work with OCP and DOEEto implement a remedial action (ra) at the river sediment project (arsp). The project involves: (1) polychlorinated biphenyls (pcbs) remediation of eleven early action areas (eaas); and (2) dredging channels and sandbars in lake and that impede safe boating. The project includes navigational dredging in the Anacostia Main separate from the RA but potentially concurrent to leveraging its dewatering and treatment facilities—and may also involve future wetland mitigation or restoration work. See outside link.
Posted Date
Oct 21, 2025
Due Date
Jan 16, 2026
Release: Oct 21, 2025
Close: Jan 16, 2026
Procurement of a contractor for the Sunset Hills 2026 Mill and Overlay Project, involving milling a two-inch depth for 19,597.1 SY of road surface and overlaying with 2" St. Louis County C-Mix.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Procurement of a contractor for the Sunset Hills 2026 Mill and Overlay Project, involving milling a two-inch depth for 19,597.1 SY of road surface and overlaying with 2" St. Louis County C-Mix.
AvailableThe West Virginia Department of Environmental Protection is soliciting bids for the OSR Powder Mill Processing Inc S-5027-08 & U-5017-08 construction/reclamation project in Wayne County, West Virginia. This is an Agency Request for Quote / Invitation for Bid, not a grant program. The procurement is active as of 2026-01-02.
Posted Date
Nov 21, 2025
Due Date
Jan 15, 2026
Release: Nov 21, 2025
Close: Jan 15, 2026
The West Virginia Department of Environmental Protection is soliciting bids for the OSR Powder Mill Processing Inc S-5027-08 & U-5017-08 construction/reclamation project in Wayne County, West Virginia. This is an Agency Request for Quote / Invitation for Bid, not a grant program. The procurement is active as of 2026-01-02.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a remediation contractor who shall be required to work with OCP and DOEEto implement a remedial action (ra) at the river sediment project (arsp). The project involves: (1) polychlorinated biphenyls (pcbs) remediation of eleven early action areas (eaas); and (2) dredging channels and sandbars in lake and that impede safe boating. The project includes navigational dredging in the Anacostia Main separate from the RA but potentially concurrent to leveraging its dewatering and treatment facilities—and may also involve future wetland mitigation or restoration work. See outside link.