Town of Avon
Road construction - HMA pavement construction, concrete pavement, sidewalk construction, shared-use path construction, storm sewer construction, driveway construction, and lighting construction.
City of Olive Branch
The project consists of the construction of Craft Road Widening from College Road to Church Road in the City of Olive Branch MS.
Town of Queen Creek
Wok includes 6,000 CY earthwork for open channels and retention basins; 104 CY riprap construction, dumped - angular d50=8"; 75 CY riprap construction, dumped - angular d50=12"; 29,000 SY subgrade preparation; 169 SY aggregate base course - 4" thick; 214 SY aggregate base course - 10" thick; 214 SY asphalt concrete pavement - type a 1/2" mix - 1.5" thick; 21,116 SY asphalt concrete pavement - type a 1/2" mix - 2" thick; 214 SY asphalt concrete pavement - type a 3/4" mix - 2. 5" thick; 20,913 SY asphalt concrete pavement - type a 3/4" mix - 3" thick; 10 ton tack coat; 2,721 LF sawcut asphaltic concrete pavement. See outside link.
Virginia Department of Transportation
13.300 Acre clearing and grubbing; 9,539 LF of 15" storm sewer pipe; 207 LF of 18" jacked and bored pipe; 307 LF pipe rehabilitation; 12,159 CY siltation control excavation; 23,183 CY storm water main basin excavation; 75,706 LF saw-cut asphalt conc full depth (I-81); 1,362 LF saw cutting; 334 LF of 8" DI sanitary sewer pipe; 37 LF of 4" sanitary service lateral connection. See attached file.
Release
Oct 23, 2025
Close
Nov 18, 2025