Summary
Work consist of 850 sf of green thermoplastic pavement marking, 3 EA of temporary drainage inlet protection, 1,100 LF of remove yellow thermoplastic traffic stripe (hazardous waste), 300 cy of roadway excavation, 2,088 SF of rock blanket, 266 cy of soil amendment, 21. 66 lb of organic fertilizer, 546 EA of plant (group a), 3,189 SF of gravel mulch, check and test existing irrigation facilities, 12 EA of 1 1/2" remote control valve, 1 EA of 12 station irrigation controller (pedestal mounted), 750 LF of 1.5" plastic pipe (schedule 40), 600 EA of riser sprinkler assembly, 380 LF of pvc pipe conduit (sleeve). See attached file.