Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of DeForest is soliciting bids for the Daentl Road Water Main Replacement, involving approximately 250 linear feet of new water main along Daentl Road. Work includes installation via horizontal directional drilling and associated site restoration as specified in the bid documents. Bid documents are accessible through the Village’s bid portal after registering as a plan holder; bids are due February 10, 2026 at 2:00 PM CST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a new replacement water line for a portion of an existing 10" cast iron water distribution main. The replacement line will be 12" and approx. 4,100 LF in length. Landscape areas, curb and gutter, asphalt, and other items to be restored to pre-construction conditions.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
Installation of a new replacement water line for a portion of an existing 10" cast iron water distribution main. The replacement line will be 12" and approx. 4,100 LF in length. Landscape areas, curb and gutter, asphalt, and other items to be restored to pre-construction conditions.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes includes replacement of approx., 4,500' of water line, installation and replacement of fire hydrants, installation of a pressure reducing valve vault station and replacement and relocation of water meters.
Posted Date
-
Due Date
Feb 25, 2026
Release: -
Close: Feb 25, 2026
Work includes includes replacement of approx., 4,500' of water line, installation and replacement of fire hydrants, installation of a pressure reducing valve vault station and replacement and relocation of water meters.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableProject consist of approx 1,378 SY of 1.5" Asphalt Milling; 32 EA of Exploratory Trenching/Utility Potholing; 1,390 LF of 12" Water Main HDD; 32 LF of 6" Water Line, PVC C900 DR18; 300 LF of 1" Water Service Line HDPE. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Project consist of approx 1,378 SY of 1.5" Asphalt Milling; 32 EA of Exploratory Trenching/Utility Potholing; 1,390 LF of 12" Water Main HDD; 32 LF of 6" Water Line, PVC C900 DR18; 300 LF of 1" Water Service Line HDPE. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →