Aug 24, 2026
Closes
Sep 7, 2026
FY26 D08 Range Flooring RFP
Requires resinous flooring system installation. The work includes removal of existing floor coatings, concrete surface preparation, repair to defects installation of a three-coat epoxy flooring system, application of custom graphics and measurement markings, and installation of a urethane topcoat with slip-resistant finish.