Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of partial demolition of walls, ceilings, and lighting. The new construction consists of several new walls, doors and so its, new ceilings and lighting, new flooring and replacement of finishes, new furniture including selected custom-designed booths for private study.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This is an Expression of Interest (EOI) solicitation issued by the Dormitory Authority of the State of New York for replacement of the hot water pumps, perimeter heating piping, insulation, valving and heating units, plus associated asbestos abatement at CUNY New York City College of Technology's Namm Building. The project will be a single-prime general construction contract with an estimated construction cost of approximately $14,000,000 to $14,500,000 and requires execution of the Project Labor Agreement by the successful low bidder. Firms shall submit one PDF copy of the EOI via email to ccontracts@dasny.org following the specified tabbed submission requirements; shortlisted firms will be invited to bid on finalized construction documents.
Posted Date
Jan 23, 2026
Due Date
Feb 24, 2026
Release: Jan 23, 2026
Close: Feb 24, 2026
This is an Expression of Interest (EOI) solicitation issued by the Dormitory Authority of the State of New York for replacement of the hot water pumps, perimeter heating piping, insulation, valving and heating units, plus associated asbestos abatement at CUNY New York City College of Technology's Namm Building. The project will be a single-prime general construction contract with an estimated construction cost of approximately $14,000,000 to $14,500,000 and requires execution of the Project Labor Agreement by the successful low bidder. Firms shall submit one PDF copy of the EOI via email to ccontracts@dasny.org following the specified tabbed submission requirements; shortlisted firms will be invited to bid on finalized construction documents.
AvailableThe Dormitory Authority of the State of New York (DASNY) seeks contractors to replace existing fuel oil-fired generators at OMH Hutchings Psychiatric Center with new natural gas or propane generators, including associated asbestos and hazardous materials abatement. Mechanical and electrical scope includes removal of fuel oil systems, new gas piping and valves, site preparation, selective demolition, concrete work, fencing, installation of new generators and temporary facility controls. Contract documents are available for purchase/viewing through Camelot Planroom (registration/purchase required); estimated cost range is approximately $2.1M–$2.35M with stated SDVOB and MWBE goals.
Posted Date
Dec 24, 2025
Due Date
Feb 11, 2026
Release: Dec 24, 2025
Close: Feb 11, 2026
The Dormitory Authority of the State of New York (DASNY) seeks contractors to replace existing fuel oil-fired generators at OMH Hutchings Psychiatric Center with new natural gas or propane generators, including associated asbestos and hazardous materials abatement. Mechanical and electrical scope includes removal of fuel oil systems, new gas piping and valves, site preparation, selective demolition, concrete work, fencing, installation of new generators and temporary facility controls. Contract documents are available for purchase/viewing through Camelot Planroom (registration/purchase required); estimated cost range is approximately $2.1M–$2.35M with stated SDVOB and MWBE goals.
AvailableProvide asbestos abatement services by zone.
Posted Date
Oct 4, 2022
Due Date
Nov 15, 2027
Release: Oct 4, 2022
Close: Nov 15, 2027
Provide asbestos abatement services by zone.
AvailableProvide improvements to the existing campuswide underground walk-through utility tunnel system, includes the replacement and reconfiguration of high-temperature hot water (HTHW) anchors and guides, and the replacement/repair of additional HTHW pipe supports to restore proper thermal movement and load distribution. Work will also involve removal and replacement of disturbed insulation and jacketing.
Posted Date
Dec 30, 2025
Due Date
Jan 27, 2026
Release: Dec 30, 2025
Close: Jan 27, 2026
Provide improvements to the existing campuswide underground walk-through utility tunnel system, includes the replacement and reconfiguration of high-temperature hot water (HTHW) anchors and guides, and the replacement/repair of additional HTHW pipe supports to restore proper thermal movement and load distribution. Work will also involve removal and replacement of disturbed insulation and jacketing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis